Loading...
Riverside Church-LR 940423 ENGLNEERING, INC. 4':47 Irvin~ I~oulevard, Suite 206 Dallas, Texas 75247 Client: Riverside Church of Christ Oate: 04/23/94 Project No. 43-1069-94 Project: Riverside Church of Christ Report No. 940145 Coppell, Texas Client No. Laboratory Test Method: ASTM D-698 Moisture Optimum Density Requirement M/D No. Material Description % (PCF) Moist'ure Density 940125 Medium brown clav. lime treated 29.7 90.0 +/-2 95% Field Test Method: ASTM D-2922/D-3017 FIELD DENSITY TEST M/D Moisture Dry Density Density Test No. .._.T_est Location No. % ....... (PCF) ....... .%. .... Test Of: General Fill 1 Final, south parking area. Retest oral on 1 31.3 88. l 97.9 Report No. 940142 2 Final. south parking area. Retest of#2 on I 28.2 87.8 97.5 Report No. 940142 3 Final. west parking area, on south end at south I 29.1 88.0 97.8 building line 4 Final, west parking area, at centerline of building 1 30.1 88.5 98.4 5 Final, north parking area at 25' east of west curb line 1 27.6 90.1 100.0 6 Final, north parking area at 30' north of the west gras 1 27.6 91.5 101.7 area. Complies except where noted (*). Technician: Dennis Tay'lor Start: 12:30 pm Stop: 1:30 pm HBC ENGINEERING, INC. Report Distribution: ~ 302KG Tr:s re;ed is exc'.usive'y ~.z.r t~e .se of the client ~ndicated abcve a-d st'a!! r.st [:e reprcduced except :n fL'l w'thO.-'. Ine writ-'.erl apr..royal of HB~ Eqg, -eering. Inc REPORT OF SOIL-LIME PULVERIZATION TESTS ENGINEERING, INC. 47a7 ].'~'ing Boul~,'ard. Suile 206 Dallas. Texa~ 75247 Client: Riverside Church of Christ Date: 04/23/94 Project No. 43-1069-94 Project: Riverside Church of Christ Report No. 940144 Coppell, Texas Client No. Test Location: Lime stabilized subgrade for parking and drive. Specification Requirements: Minimum Passing 100 Sieve: 1 1/2" Minimum Passing 60 Sieve: Sample Condition: After final mixing. Total Sieve Size: 1 1/2" Sieve Size: t/-4 Test Sample Weight Percent Percent Weight Percent Percent No. Test Location Weight Retained Retained Passing Retained Retained Passing 1 North parking area, at center line of building at center of lot 10 lbs. 0 0 100 3.8 lbs. 38 62 2 Northeast corner of north parking area 10 lbs. 0 0 100 4 lbs. 40 60 3 East side parking area at north end building line, center line of lot 10 lbs. 0 0 100 3.7 lbs. 37 63 Complies except where noted (*). Technician: Dennis Taylor start: 1:30 pm Stop: 3:00 pm HBC ENGINEERING, INC. Report Distribution: 302KG Tl':s re:-or~ ~s exclusive'y fxr t'~e use of:ge cl~enl ino.ca:ed above and shall not ce reproducec except ir f;~l' wilr,,c~u: the wTi:ten approval cf HE, C En~reenns. Inc.