Riverside Church-LR 940421 ENGINEERING, LNC.
474': hx'ing Boulevard, Stole 206
Dallas. Tex~s 75247
Client: Riverside Church of Christ Date: 04/21/94
Project No. 43-1069-94
Project: Riverside Church of Christ Report No. 940127
Coppell, Texas Client No.
Test Location: Lime stabilized subgrade for parking and drive on south end of building.
Specification Requirements:
Minimum Passing 100 Sieve: 1 1/2"
Minimum Passing 60 Sieve: it4
Sample Condition: After final mixing.
Total Sieve Size: I 1/2" Sieve Size: ~
Test Sample Weight Percent Percent Weight Percent Percent
No. Test Location Weight Retained Retained Passing Retained Retained Passing
1 North parking area, at center line of
building at center of lot 10 lbs. 0 0 100 4.0 lbs. 40 60
2 Northeast corner of north parking
area 10 lbs. 0 0 100 3.7 lbs. 37 63
3 East side parking area at north end
building line, center line of lot 10 lbs. 0 0 100 4.0 lbs. 40 60
Complies except where noted (*).
Technician: Dennis Taylor
Start: 12:30 pm Stop: 2:00 pm
HBG ENGINEERING, lNG.
Report Distribution:
303KG This repc"[ is exclusive.y for the use of the c!ienl ,ne,ca:ed a~:;'e ant s~'a,, nc.: ~.e 'e~rocJzec except ir f-.,!: w~hcut lhe w;~tter' acproval c' HBC EnGi=eering. inc.
ENGEqEERIi~, INC.
~74'~ Irving Beu!e~,ard. Smite 206
Dallas, Texas 75247
Client: Riverside Church of Christ Date: 04/21/94
Project No.
Project: Riverside Church of Christ Report No. 940126
Coppell, Texas Client No.
Laboratory Test Method: ASTM D-698
Moisture
Optimum Density Requirement
M/D No. Material Description % (PCF) ... --"l~loisture Densi~---'-
940030 Medium tan clay 23.2 96.4 0/+4 95
Field Test Method: ASTM D-2922 / D-3017
FIELD DENSITY TEST
M/D Moisture Dry Density Density
Test No. Test Location No. % ..... (_PCF) __. %
Test Of: General Fill
Location: 18" Storm Line
1 Final lift, 45' north of south culvert, east side 1 '21.0 94.5 98.0
2 Final lift, 200' north of south culvert, east side 1 '21.4 95.5 99.3
3 Retest of # 1, this report. I 23.1 95.9 99.5
4 Retest #2, this report 1 23.6 96 99.5
Technician: Dennis Taylor
Start: 10:00 am Stop: 11:00 am HBO ENGINEERING, ~/vfi.""~
02:00 pm 02:30 am
Report Distribution:
302KG This repcrt ~s exs.usively for the use of the cl~en', ~Pchcate3 a~.ove a'~d sha;l col be reproduced except sn fb!l w~tho~Jt the written approval of-HBO En,~i~eer=ng. In.....