Loading...
Riverside Church-LR 940421 ENGINEERING, LNC. 474': hx'ing Boulevard, Stole 206 Dallas. Tex~s 75247 Client: Riverside Church of Christ Date: 04/21/94 Project No. 43-1069-94 Project: Riverside Church of Christ Report No. 940127 Coppell, Texas Client No. Test Location: Lime stabilized subgrade for parking and drive on south end of building. Specification Requirements: Minimum Passing 100 Sieve: 1 1/2" Minimum Passing 60 Sieve: it4 Sample Condition: After final mixing. Total Sieve Size: I 1/2" Sieve Size: ~ Test Sample Weight Percent Percent Weight Percent Percent No. Test Location Weight Retained Retained Passing Retained Retained Passing 1 North parking area, at center line of building at center of lot 10 lbs. 0 0 100 4.0 lbs. 40 60 2 Northeast corner of north parking area 10 lbs. 0 0 100 3.7 lbs. 37 63 3 East side parking area at north end building line, center line of lot 10 lbs. 0 0 100 4.0 lbs. 40 60 Complies except where noted (*). Technician: Dennis Taylor Start: 12:30 pm Stop: 2:00 pm HBG ENGINEERING, lNG. Report Distribution: 303KG This repc"[ is exclusive.y for the use of the c!ienl ,ne,ca:ed a~:;'e ant s~'a,, nc.: ~.e 'e~rocJzec except ir f-.,!: w~hcut lhe w;~tter' acproval c' HBC EnGi=eering. inc. ENGEqEERIi~, INC. ~74'~ Irving Beu!e~,ard. Smite 206 Dallas, Texas 75247 Client: Riverside Church of Christ Date: 04/21/94 Project No. Project: Riverside Church of Christ Report No. 940126 Coppell, Texas Client No. Laboratory Test Method: ASTM D-698 Moisture Optimum Density Requirement M/D No. Material Description % (PCF) ... --"l~loisture Densi~---'- 940030 Medium tan clay 23.2 96.4 0/+4 95 Field Test Method: ASTM D-2922 / D-3017 FIELD DENSITY TEST M/D Moisture Dry Density Density Test No. Test Location No. % ..... (_PCF) __. % Test Of: General Fill Location: 18" Storm Line 1 Final lift, 45' north of south culvert, east side 1 '21.0 94.5 98.0 2 Final lift, 200' north of south culvert, east side 1 '21.4 95.5 99.3 3 Retest of # 1, this report. I 23.1 95.9 99.5 4 Retest #2, this report 1 23.6 96 99.5 Technician: Dennis Taylor Start: 10:00 am Stop: 11:00 am HBO ENGINEERING, ~/vfi.""~ 02:00 pm 02:30 am Report Distribution: 302KG This repcrt ~s exs.usively for the use of the cl~en', ~Pchcate3 a~.ove a'~d sha;l col be reproduced except sn fb!l w~tho~Jt the written approval of-HBO En,~i~eer=ng. In.....