ST9302-CN011017 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRA C TOR : 0 WNER: CHANGE ORDER: SAND Y LAKE ROAD PROJECT # ST 93-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL #8 DA TE : 10/10/01 ADD: Turn LanefMedian Opening at Heatherglen Item Quantity Unit Description Unit Price Total Price 1 LS Turn lane and median crossover at 25,000 $25,000.00 Heatherglen / Sandy Lake intersection complete and in place. Includes: 1. Sawing and removal of the curb; 2. Excavation of the median to include over excavation for CTB; 3. Placement of CTB; 4. Concrete pavement; 5. Two paver noses; 6. Remove and relay conduit; 7. Install jiggle bar tiles to delineate turn lane; 8. Backfill and cleanup of the area. Net Increase $ 25,000.00 TOTAL CHANGE ORDER #8 $25,000.00 Previous Contract Amount Total Change Order #8 Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $9,892,162.70 $ 25,000.00 $9,917,162.70 12 Days 1067 Days The contractor hereby accepts this contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason for this revision to the Contract. FA)~ (214) 3~2-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 October 17, 2001 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re'. Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: Enclosed for your review and incorporation into the contract are two executed copies of change order #8. If you have any questions regarding this change order, don't hesitate to contact our office. Rl~~cCerely' ~ion Company Project Manager XC; Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRA CTOR: OWNER: CHANGE ORDER: SAND Y LAKE ROAD PROJECT # ST 93-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL #8 DATE: ADD: Turn Lane/Median Opening at Heatherglen Item Quantity Unit Description Unit P/~ce Total Price 1 LS Turn lane and median crossover at 27,~38.73 $27,458.73 Heatherglen / Sandy Lake intersection complete and in place. // Includes: ~f.~ O 00 2. Excavation of the median to include over excavation for CTB; 3. Placement of CrB; 4. Concrete pavement; 5. Two paver noses; 6. Remove and relay conduit; 7. Install jiggle bar tiles to delineate turn lane; 8. Backfill and cleanup of the area. 1 ~ v- ~t~' ,, [¥,~ Net Increase $ 27,458.73 TOTAL CHANGE ORDER #8 $27,458.73 Previous Contract Amount Total Change Order #8 Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $9,892,162.70 $ 27,458.73 $9,919,621.43 12 Days 1067 Days The contractor hereby accepts this contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason for this revision to the Contract. Accepted by Owner Date Recommended by City Engineer / / Date Agreed to by Contractor Date T H E C I T Y 0 F COPPELL February l7,2000 Robert Weber Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Re: Sandy Lake Road Project # ST 93-02 Change Order #8 Dear Mr. Weber: Enclosed are three (3) originals of Change Order No.8 for the turn lane and median opening at Heather Glen. Please execute and return two originals to the City of Coppell Engineering Department as soon as possible. Should you have any questions or need any additional information please feel free to contact me at your convenience. Sincerely, Director of Engineering/Public Works cc: Garreth Campbell, Inspector file/ST93-O2/bell/021700chgord4 25,5 PARKWAY 1Ir P-O,BOX 478 'Jr COPPELL TX 75019 1~' TEL 9'72/462 0022 ~ FAX 972/30,4 3673 FA)~ (21'~) 352-,3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 October 4, 2001 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: EBCC has reviewed the plans for the turn lane and median cross over at Heatherglen. We generally agree with the quantities stated in your letter; however, we believe that the excavation quantity is actually 150 CY to 200 CY and that the paving item is slightly larger than the quantity stated in your letter. Additionally, we propose eliminating the lime stabilization of the subgrade and replacement of the stabilization with cement treated base. Our lump sum price for construction of this work is $27,458.73 and includes the following elements of work: 2. 3. 4. 5. 6. 7. on SD2. 8. Sawing and removal of the curb Excavation of the median to include over excavation for CTB (230 LF). Placement of CTB. Concrete pavement. Two paver noses. Remove and relay 250 LF of conduit. Install jiggle bar tiles to deliniate turn lane in accordance with Coppell Standard Button Detail Backfill and cleanup of the construction area. EBCC requests an additional twelve (12) calendar days to complete this work. If you have any questions regarding this information, don't hesitate to contact our office. rely, .  n.s~tion Company Robert D. Weber Project Manager XC: Michael G. DeMotte, Kimley-Horn and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER SCALE 1~ = 20' 30' WL 30' WL SAN]3Y LAKE 3+00 60,0 WL 45,2 100,0 48' RCP SCALE 1n = 20' SANDY LAKE ~3 +,,010. GO,O 45,2 14+00 i00,[~ 15,