Loading...
Riverside Church-LR 940418REPORT OF IN-PLACE DENSITY TESTS ENGLNEERR~, INC. -:74't l:',ing Boui¢',ard. Suite 2(>6 Dallas. Texas 75247 Client: Riverside Church of Christ Date: 04/18/94 Project No. 43-1069-94 Project: Riverside Church of Christ Report No. 940047 Coppell, Texas Client No. Laboratory Test Method: ASTM D-698 Moisture Optimum Density Requirement MID No. Material Description % (PCF) ---~-0i~t'~Ji:e--' Density 940031 Medium to dark brown clay with limestone 20.7 101.2 at or above 95% 940032 Medium to dark brown clay with limestone and gravel 16.0 110.2 at or above 95% 940030 Medium tan clay 23.2 96.4 at or above 95% 940029 Dark gray clay 21 100.3 at or above 95% Field Test Method: ASTM D-2922 / D-3017 FIELD DENSITY TEST MID Moisture Dry Density Density Test No. Test Location No. % (PCF) % Test Of: General Fill 16 2nd lift. east side drive, at centerline of bldg. I 18.2 100.6 99.4 i 7 3rd lift, east side drive, at centerline of bldg. 2 17.6 ! 07.7 97.8 18 4th lift, east side drive, at centerline of bldg. 2 14.4 107.8 97.9 19 2nd lift, west side drive at south end of bldg. 3 22.0 93.4 96.8 20 2nd lift. west side drive at centerline of bldg. 3 23.2 92.7 96.1 21 2nd lift, west side drive at north end ofbldg. 4 23.1 97.6 97.3 Technician: Dennis Tay.'lor Start: 12:30 pm Stop: 2:00 pm HBC ENGINEERING, INC. Report Distribution: ,/ ENGkNEE~, LNC. 4747 [tx-rog Boulevard Suite 206 Dallas, Texa~ 75247 Client: Riverside Church of Christ Date: 04/18/94 Project No. 43-1069-94 Project: Riverside Church of Christ Report No. 940044 Coppell, Texas Client No. Laboratory Test Method: ASTM D-698 Moisture Optimum Density Req_u.!_r_.e. ment M/D No. Material Descd__P_ti_o_n- ............... _% ..... (PCF) "'Moisture Densi_ty -- 940029 Dark gray clay 21.0 100.3 at or above 95% 940030 Medium tan clay 23.2 96.4 at or above 95% Field Test Method: ASTM D-2922 / D-3017 FIELD DENSITY TEST M/D Moisture Dry Density Density Test No. Test Location No. % ..... (PCF) % Test Of: General Fill 1 I 1st lift, east side drive, south end 2 35.4 92.3 95.8 12 I st lift, east side drive, center area 2 32.9 91.9 95.4 13 Subgrade, building pad, southeast quadrant 2 29.5 91.6 95.0 14 Subgrade, building pad, center at west side I 26.5 101.2 100.9 15 Subgrade, building pad, northeast quadrant I 25.1 99.3 99.0 Technician: Dennis Taylor Start: 1:30 pm Stop: 3:00 pm HBC ENGINEERING, INC. Report Distribution: ~r~~ 302KG T.'.;s repo~ ~s excl:~s:ve:y fc~ I've use of the cherd .n~icated above aqd sba:: not I::e 'eprocace3 excec: ~- % w':hcb! the wqtten apc-oval cf HBC EngineerinG. Inc