Loading...
Shadowridge P1-3-LR 840928 (2)Maxim Engineers Inc. Geotechnical Materials Testing Consultants 2342 Faben~ PO. Box 59902 Dallas Texas 75229 (214) 247-7575 General Report Iclentificatm~ Mett~od of Test 09/28/84 S.m~ o,~ L. H. Lacy Company Shadow Ridge, Job #46104 - Coppell, Texas Portland Cement, Air and Unit Weight 09/28/84 (Scheduled)~ Resu~s Time Maxim Engineers, Inc. scheduled for service: Type of service scheduled: As in identification. Reason for delay or cancellation: Rain,. 7:30 a.m. Time left lab: Time arrived at job: Time left job: Time returned lab: Total stand by time: 7:00 a.m. 7:30 a.m. 8:00 a.m. 8:30 a.m. I 1/2 hours 12000-408119 Technician: B.M. /ms Distribution: L. H. Lacy Company - Bubba Keathly L. H. Lacy Company - Margo Aranda (2) City of Coppell - Mark Sweeney Ginn, Inc. - Wayne Ginn, P.E. Maxim En~ne~, Inc.