Loading...
Riverside Church-LR010918 0'~...-26..."2001 lpg: 35 '9~2L--:~08S02 TRINITY ENGR-DALLA? PAGE 82 A TRINITY ENGINEERING / KLEINFELDER · , 22' i Gantt;fy Center Blvd. Suite 101, Irv;ng, Tex~e 75C62 T E m (2 (2) 972-870-0808 Metro 972-953-C398 Fax 972-870-0802 TO: Rive,side Church of Christ PROJECT: Riverside Church of Christ 150 E. Beltline Roaa Coppell, Texas Coppetl, Texas 75019 TETCO No.: 4006 REPORT DATE: 9/18/0~, REPORT NO.: 9010188 Test date: 9/14/01 Tecnniciap: M. Escalan;e Trinity Engineering / Kleinfelder's representative was on site on this c~ate as scheduled. However, -'.he sched~.led piers were cancelled because there were no casings. 2. vhen.. Attn: Grog McGahey TRINITY ENGINEERING I KLEINFELDER 2. CI~ of Coppell (fax) ......_ A~n: Lar~ Dav~s · A~n: Lee Stone 1- V. Aubrey Hallum Amhite~s, AEn: Bob Bandy Wm. Duane Harrell, P.E. I- Mille~ E~ineedn~ Group, Affn: John Mille~, P.E.