Loading...
Riverside Church-LR010830ATRINITY ENGINEERING/KLEINFELDER August 30, 2001 Project No: T-4006 Report No: 8010441 Mr. Greg McGahey Riverside Church of Christ 150 E. Beltline Road Coppell, Texas 75019 Re: Construction Materials Services Riverside Church of Christ Coppeli, Texas Dear Mr. McGahey: As requested by Mr. David Turner with K.B. Alexander. Trinity Engineering/Kleinfelder (Trinity) has completed this phase of the testing and evaluation of the building pad. This phase included post-injection testing. The specifications for the project require sampling of the chemical-injected pad at an interval of one boring for each 5,000 square feet. We used continuous sampling techniques at 1-toot intervals to the injection depth. We understand that the swell tests, performed on selected soil samples, should have an individual maximum swell of 2 percent and an average not to exceed 1 percent for each boring. Additionally.', the moisture content of each-sample is determined. The field sampling consisted of five borings drilled within the injected area on August 21. 2001. The borings were continuously.' sampled to a depth 10 feet below the existing ground surface. We selected four swell samples t¥om each boring and tested each at an overburden pressure equivalent to the soil overlying the sample. The results are attached on Plates 1 and 2. Post- Injection Test Results. The results were evaluated using the previously mentioned acceptance criteria. Based on the swell test data. it appears that the injected pad is within specified limits. It has been a pleasure to provide this service. If y-'ou have any questions or comments, please contact us. Sincerelv~ IRINIIY ENGINEERING / KLEINFELDER Wm. Duane Harrell, P.E. Attachments: Post-Injection Test Results. Plates 1 and 2 Cc: Mr. David Turner, K.B. Alexander Mr. Larry Davis and Lee Stone, City of Coppell Mr. Bob Band3', V. Aubrev Hallum Architects Mr. John Millett, P.E., Mi[leu Engineering Group T-4006..'6911R 188 August 3(! 2.'}fl I Copyright 2001 Trinity Engineering .' Kleinfelder '~'~' i Cen~ur~ Cc.r~tc-' [~}ot. lt"~,irtl. Suite 1C, 1 · [r~ n~ texas 75062 · .t~v., 67'0-,:_}g0~ 972,370-(:b;02 TRINITY ENGINEERING / KLEINFELDER 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 (972) 870-0808 FAX (972) 870-0802 POST-INJECTION TEST RESULTS Project: Riverside Church of Christ Date: 8/30/01 Location' Coppell, Texas Project No: T-4006 Report No: 8010441 Boring Depth Sample Pocket Initial Percent Swell No. (ft) Location Pen. Moisture IndividualI Average (tsf) Content (%) I 0-1 4.5 17 0.2 1-2 2.5 25 2-3 1.5 25 3-4 13' West & 13' South of 4.5 26 0.0 B-01 4-5 Northeast corner of Gym 2.0 20 0.0 5-6 2.0 21 0.0 6-7 Building 1.5 28 7-8 1.5 21 0.0 8-9 2.5 25 9-10 3.0 29 0-1 1.0 23 1-2 1.0 19 0.7 2-3 1.5 24 3-4 42' West & 35' South of 3.5 23 0.2 B-02 4-5 Northeast corner of Gym 1.5 33 0.3 5-6 1.5 20 0.0 6-7 Building 2.0 26 7-8 1.5 20 0.3 8-9 2.0 29 9-10 2.0 28 0-1 1.0 19 1.2 1-2 2.0 24 2-3 3.0 25 3-4 67' West & 48' South of 2.5 17 1.5 B-03 4-5 Northeast corner of Gym 3.0 28 0.925 5-6 2.5 20 0.8 6-7 Building 1.5 29 7-8 3.0 21 0.2 8-9 2.0 27 9-10 2.0 28 Remarks: T-4006.'691 I R 188 Plate I TRINITY ENGINEERING / KLEINFELDER 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 (972) 870-0808 FAX (972) 870-0802 POST-INJECTION TEST RESULTS Project: Riverside Church of Christ Date: 8/30/01 Location' Coppell, Texas Project No: T-4006 Report No: 8010441 Boring Depth Sample Pocket Initial Percent Swell No. (ft) Location Pen. Moisture IndividualI Average (tsf) Content (%) I 0-1 1.0 19 1-2 2.0 19 1.8 2-3 2.5 23 3-4 35' East & 88' North of 1.5 22 0.4 4-5 1.0 30 A-01 Southeast corner of 0.8 5-6 2.0 23 0.4 6-7 Existing Church Building 2.0 28 7-8 1.0 0 0.4 8-9 3.0 27 9-10 2.5 25 0-1 2.0 20 0.0 1-2 1.5 25 2-3 1.5 25 3-4 53' East & 10' North of 1.5 22 0.6 4-5 1.5 22 A-02 Southeast corner of 0.4 5-6 2.0 23 0.6 6-7 Existing Church Building 2.5 28 7-8 2.0 21 0.2 8-9 3.0 27 9-10 4.5 25 Remarks: T-4006."6911R 188 Plate 2