Loading...
SC-Coppell HS-LR000804FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: August 4, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: June 8, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7088159 CONCRETE SUPPLIER: Lattimore 88 PLANT/TRUCK: 7/753 85 MIX ID NUMBER: 42 11:48 am AIR (%) (ASTM C-23'1): 12:40 pm WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C.143): 6 1/4 Retaining wall north side of stadium southeast side 1 foot north 2 feet up CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1230 7 06/15/00 89200 3160 4000t28 days CHC 1231 28 07/06/00 107600 3810* CHC 1232 28 07/06/00 108200 3830* CHC 1233 56 08/03/00 124800 4410 Fracture mode is (A) unless other~Nise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: * Does not meet required compressive strength at 28 days. Technician: Yancey Bivings FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis.--''~ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford