Loading...
SC-Coppell HS-LR000728FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: PROJECT: REPORT NO: Coppell lSD c/o DaI-Mac Construction Co. Coppell High School, Stadium Expansion 17 DATE: July 28, 2000 PROJECT NO: 0791-2208 PAGE 1 Owner: Architect: Engineer: Contractor: Fabricator: Coppell lSD SHW Group SHW Group DaI-Mac Construction Co. Alpha Industries Location of Project: Coppell, Texas ~ Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on (Str I Steel - Metal Deck Units) or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Goveming Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See attached Field Reoorts for Sl~ecific Items Inspected or Tested and Type of Inspection or TestlnQ oerformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance Non Compliance X Note: Workmanship type deviations noted dudng Inspection, which are being corrected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings, and Governing Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI Inspected By: Distribution: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) DaI-Mac Construction - Damon_~[orman City of Coppell - Larry Davis-~ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore Doug Post STR-1