SC-Coppell HS-LR000728FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972)484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT:
PROJECT:
REPORT NO:
Coppell lSD c/o DaI-Mac Construction Co.
Coppell High School, Stadium Expansion
17
DATE: July 28, 2000
PROJECT NO: 0791-2208
PAGE 1
Owner:
Architect:
Engineer:
Contractor:
Fabricator:
Coppell lSD
SHW Group
SHW Group
DaI-Mac Construction Co.
Alpha Industries
Location of Project: Coppell, Texas ~
Inspection Performed At: Job Site X Fabrication Shop
DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on (Str I Steel - Metal Deck Units) or
Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project
specifications, Contract Documents, Drawings, and Goveming Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI.
See attached Field Reoorts for Sl~ecific Items Inspected or Tested and Type of Inspection or TestlnQ oerformed
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: X
In Compliance
Non Compliance X
Note: Workmanship type deviations noted dudng Inspection, which are being corrected at time of Inspection, are not being listed on Report.
NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings, and Governing
Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI
Inspected By:
Distribution:
Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT)
DaI-Mac Construction - Damon_~[orman
City of Coppell - Larry Davis-~
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
Doug Post
STR-1