Loading...
SC-Coppell HS-LR000720FUGRO SOUTH, INC. i 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 20, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 24, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087366 83 80 8:26 am 9:10 am Sunny CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/958 MIX ID NUMBER: 42 AIR (%) (ASTM C.231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C.143): 5.50 Hand rail for top level of west side stands northwest corner, 120 feet south of northwest end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1196 7 05/31/00 78800 2790 4000~28 days CHC 1197 28 06/21/00 97000 3430* CHC 1198 28 06/21/00 96100 3400* CHC 1199 56 07/19/00 113700 4020 Fracture mode is (A) unless o~erwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~] [~ [~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: * Does not meet required compressive strength at 28 days. Technician: Yancey Bivings FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - D~mon Norman City of Coppell - Lee' Stone,..~ " City of Coppell -.Larry Davis CopPell ISD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, cJo Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: July 20, 2000 Project No,: 0791-2208 SAMPLE DATE: June 21, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7088626 82 81 8:57 am 9:35 am Cloudy CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C-143): LMC Sidewalk section E at main entrance on east side of school from center of entrance, 10 feet east, 5 feet south CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1254 7 06/28~00 66500 2350 3000/28 days CHC 1255 28 07/19/00 105000 3710 CHC 1256 28 07/19/00 107100 3790 CHC 1257 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~)1 rl--~ [-~ r-] Curing: Methods: ASTM C-39 Fracture: AY..~l V',,I V I LJB C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings Reviewed By: ~ FUGRO SOUTH INC. DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford