SC-Coppell HS-LR000710FUGRO SOUTH, INC.
(972)484-8301: F:~x (972) ~20-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 10, 2000
PROJECT: Coppe, High School, Stadium Expansion Project No.: 0791-2208
Coppell, Texas
SAMPLE DATE: June 9, 2000
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F) (ASTM C.1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
The Cortez Group
7088266
79
86
10:18 am
11:10 am
CONCRETE SUPPLIER: Lattimore
PLANT/TRUCK: 7
MIX ID NUMBER: 42
AIR (%) (ASTU C-231):
WATER ADDED (gal): 15
Sunny SLUMP (in.) (ASTM C-143): 5 3/4
Retaining wall north end of stadium west half, 2 feet from center, 2 feet
up from fleer
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x t2", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYUNDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER Idays) TESTED (pounds) (psi) (psi)
CHC 1234 7 06/16/00 99000 3500 4000/28 da~/s
CHC 1235 28 07/07/00 123200 4360
CHC 1236 28 07/07~00 122700 4340
CHC 1237 Hold Fracture mode is (A) un.le_~_~ ,;,~-,erw;~ r,o~d
Specifications: Making & ASTM C'31 Testing ASTM C'143' Types°f [~] [~ [~1 D
Curing: Methods: ASTM C-39 Fracture: A B C , D ,
r
REMARKS:
Technician:
SMH/rm
Distribution:
Yancey Bivings
FUGRO SOUTH INC.
Reviewed By: ~
DaI-Mac Construction - Damon Norman
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford