Loading...
SC-Coppell HS-LR000710FUGRO SOUTH, INC. (972)484-8301: F:~x (972) ~20-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 10, 2000 PROJECT: Coppe, High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: June 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7088266 79 86 10:18 am 11:10 am CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7 MIX ID NUMBER: 42 AIR (%) (ASTU C-231): WATER ADDED (gal): 15 Sunny SLUMP (in.) (ASTM C-143): 5 3/4 Retaining wall north end of stadium west half, 2 feet from center, 2 feet up from fleer CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x t2", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER Idays) TESTED (pounds) (psi) (psi) CHC 1234 7 06/16/00 99000 3500 4000/28 da~/s CHC 1235 28 07/07/00 123200 4360 CHC 1236 28 07/07~00 122700 4340 CHC 1237 Hold Fracture mode is (A) un.le_~_~ ,;,~-,erw;~ r,o~d Specifications: Making & ASTM C'31 Testing ASTM C'143' Types°f [~] [~ [~1 D Curing: Methods: ASTM C-39 Fracture: A B C , D , r REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford