Loading...
SC-Coppell HS-LR000707FUGRO SOUTH, INC. 2880 Vl~go Lane; Oatla~, Texas 75~r29 Ph (972) 4848301; F~x (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 7, 2000 PROJECT: Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: June 8, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7088159 88 85 11:48 am 12:40 pm CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/753 MIX ID NUMBER: 42 AIR (%) (ASTM C.231): WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C.143): 6 1/4 Retaining wall north side of stadium southeast side 1 foot north 2 feet up CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1230 7 06/15/00 89200 3160 4000/28 days CHC 1231 28 07/06/00 107600 3810' , CHC 1232 28 07~06~00 108200 3830* CHC 1233 56 08/03/00 Fracture ,T~e is (A) un,~s~., oltm,-.V, ss no~cl Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~] [~ [~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: * Does not meet required compressive strength at 28 days. Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis-//' Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford