Loading...
SC-Coppell HS-LR000622FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: June 22, 2000 PROJECT: Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: May 24, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087366 83 80 8:26 am 9:10 am Sunny CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/958 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5.50 Hand rail for top level of west side stands northwest comer, 120 feet south of northwest end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1196 7 05/31/00 78800 2790 4000/28 days CHC 1197 28 06/21/00 97000 3430* CHC 1198 28 06/21/00 96100 3400* CHC 1199 56 07/19t00 Fracture mode is (A) unless othem~ise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof r~ r-~ r~ N Cudng: Methods: ASTM C-39 Fracture: Av~ Y_.31 Y._J L..JB C D REMARKS: * Does not meet required compressive strength at 28 days. Technician: Yancey Bivings FUGRO SOUTH INC. SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford