Loading...
SC-Coppell HS-LR000621FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: June 21, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas - SAMPLE DATE: May 25, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 82 CONCRETE TEMP. (°F) (ASTM C-1064): 84 TIME BATCHED: 7:01 am TIME SAMPLED: 8:15 am WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: The Cortez GrOup CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/1039 MIX ID NUMBER: 42 AIR (%) (ASTM C.23t): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 5.50 Slab for Press Box location 18-D CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1200 5 05/30/00 71300 2520 4000/28 days CHC 1201 7 06/01/00 76500 2710 CHC 1202 28 06/22/00 97400 3450* CHC 1203 28 06/22/00 101200 3580* CHC 1204 56 07/20/00 107800 3810* CHC 1205 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: * Does not meet required compressive strength at 28 or 56 days. Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis~/' Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford mil FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: REPORT NO: Owner: Architect: Enginebr: Contractor: Fabricator: STRUCTURAL STEEL INSPECTION REPORT Coppell lSD c/o DaI-Mac Construction Co. Coppell High School, Stadium Expansion 16 DATE: June 21, 2000 PROJECT NO: 0791-2208 PAGE 1 Coppell lSD SHW Group SHW Group DaI-Mac Construction Co. Alpha industries Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on ~Str I Steel - Metal Deck Units} or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. ~ee attached Field Raoorts for Soeciflc Items Insoected or Te_~t_ad and Tvoe of Insoection or Teetinn oerformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance Non Compliance X Note: Workmanship type deviations noted during Inspection, which are being corrected at time of Inspection, are not tieing listed on Report. NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings. and Governing Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI Inspected By: Doug Post, AWSICertified Welding Inspector, ASNT/Certified Level 2 (UT, MT) Distribution: DaI-Mac Construction - Damo..0J~orman City of Coppell - Larry Davis-' Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore Doug Post STR-1