Loading...
SC-Coppell HS-LR000607FUGRO SOUTH, INC. 2~30 Vlrgo Lane; C~;i~s, Texa~ i5229 Ph (972) 484-8301; Fax (972) 62~-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dai- Mac Construction Co. Report Date: June 7, 2000 PROJECT: Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: May 19, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087315 65 74 11:50 am 12:20 am Cloudy Beams Line 24 CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/755 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER Idays) TESTED (pounds) (psi) (psi) CHC 1170 4 05123/00 101100 3580 4000/28 days CHC 1171 7 05/26/00 121400 4280 CHC 1172 18 06106/00 136200 4840 CHC 1173 18 06/06/00 139100 4920 CHC 1174 Hold CHC 1175 Hold Fracture mode is (A) unless otherwise holed Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~] ~ Cudng: Methods: ASTM Co39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~, DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 752129 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: June 7, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 19, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087309 68 75 10:36 am 11:20 am Cloudy Beams Line 22 CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/1045 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1164 4 05/23/00 115100 4070 4000~28 days CHC 1165 7 06126/00 135100 4780 CHC 1166 18 06/06/00 153800 5440 CHC 1167 18 06/06~00 158000 5590 CHC 1168 Hold CHC 1169 Hold Fracture mode is (A) unless otherwise Specifications: Making & ASTM C-31 Testing ASTM C'143, Typesof ~] [~ [~ ~-] Curing: Methods: ASTM C-39 Fracture: A B C REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c~o Dal - Mac Construction Co. Report Date: June 7, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 19, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087305 62 71 9:58 am 10:15 am Cloudy Beam Line #21 CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/753 MIX ID NUMBER: 42 AIR (%) (ASTM C.231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C.t43): 5 1/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECI~-i~.D COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1158 4 05/23/00 99700 3530 4000/28 days CHC 1159 7 05/26/00 107600 3810 CHC 1160 18 06/06/00 134300 4750 CHC 1161 18 06/06/00 132900 4700 CHC 1162 Hold CHC 1163 Hold Fracture f~oGe is (A) unless o~erwise Specifications: Making & ASTM C-31 Testing ASTM 0-143, Typesof ~ [~ [~ Curing: Methods: ASTM C-39 Fracture: A B C D , REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford