Loading...
SC-Coppell HS-LR000601FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; F~x (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: June 1, 2000 Project No.: 0791-2208 SAMPLE DATE: May 24, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087366 83 80 8:26 am 9:10 am Sunny CONCRETE SUPPLIER: LMC PLANT/TRUCK: 71958 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5.50 Hand rail for top level of west side stands northwest corner, 120 feet south of northwest end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1196 7 05/31/00 78800 2790 4000/28 days CHC 1197 28 06/21/00 CHC 1198 28 06/21/00 CHC 1199 Hold Fracture mode is (A) unless othenvise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~1 r'~ ~-'~ n Curing: Methods: ASTM C-39 Fracture: AV~l V~I VI I lB C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford