Loading...
SC-Coppell HS-LR000531FUGRO SOUTH, INC. 2680 Vlrgo Lane; Dallas. Texas 75229 Ph (972)484-8301; Fax (972)620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: May 31,2000 Project No.: 0791-2208 SAMPLE DATE: May 19, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087305 62 71 9:58 am 10:15 am Cloudy Beam Line #21 CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/753 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5 1/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1158 4 05/23/00 99700 3530 4000/28 days ....... CHC 1159 7 05/26/00 107600 3810 CHC 1160 28 06/06/00 CHC 1161 28 06/06/00 CHC 1162 Hold CHC 1163 Hold Fracture mode is (A)' unless otherwise noted Specifications: Making & ASTM C'31 Testing ASTM C'143' Types°f [~] [~ [~ D Curing: Me~hods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: .~::::~/' DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: May 31, 2000 Project No.: 0791-2208 SAMPLE DATE: May 19, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087309 68 75 10:36 am 11:20 am Cloudy Beams Line 22 CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/1045 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 SLUMP (in.) (ASWa C-143): 4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPEClFIEO COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) , (psi) (psi) CHC 1164 4 05/23100 115100 4070 4000/28 days CHC 1165 7 06/26/00 135100 4780 CHC 1166 28 06/06/00 CHC 1167 28 06/06/00 CHC 1168 Hold CHC 1169 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ [~1F"] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 'O 2880 Vlrgo lane; C)~lla~, T~xas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppelt, Texas Report Date: May 31, 2000 Project No.: 0791-2208 SAMPLE DATE: May 19, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087315 65 74 11:50 am 12:20 am Cloudy Beams Line 24 CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/755 MIX ID NUMBER: 42 AIR (%) (ASTU C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12', 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) , , C HC 1170 4 05/23/00 101100 3580 4000/28 days CHC 1171 7 05/26/00 121400 4280 CHC 1172 28 06106/00 CHC 1173 28 06/06/00 CHC 1174 Hold CHC 1175 Hotd Fracture mode is (A) unless otherwiss noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~3 [~] [~ r-~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppetl - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford