SC-Coppell HS-LR000522FUGRO SOUTH, INC. 2880 virgo Lane; Oallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas SAMPLE DATE: Report Date: May 22, 2000 Project No.: 0791-2208 April 21, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASWa C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Coatez Group 7085976 CONCRETE SUPPLIER: Lattimore 84 PLANT/TRUCK: 7 / 947 77 MIX ID NUMBER: 42 1:49 AIR (%) (Aswa c.231): 4.5 2:30 WATER ADDED {gal): 15 Clear/Sunny SLUMP (in.) (ASTM C.143): 5.0 Grid Line 22-24 at Line "A" CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS -. : Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER <days) TESTED (pounds) (ps!) (psi) CHC 972 7 4-28-00 56000 1980' 3000/28 days CHC 973 28 5-19-00 93600 3310 CHC 974 28 5-19-00 95700 3390 CHC 975 Hold 5-19-00 Fracture n-.3Ge is (A) un;e~s' otherwise no~ Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ r-~ r--~ N cudng: Methods: ASTM C-39 Fracture: AILN Y...3 Y_.I L..JB C D REMARKS Technician: Bryan Hersley FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 22, 2000 Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppetl, Texas DATE PERFORMED: May 19, 2000 General Contractor: The Cortez Group Method of Test: Applicable ACI Recommendations and ASTM Standards Results ! Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Beams for Stadium Stands - Beam Line 20 through 24 10:00 a.m. 1:00 p.m. 120 3.0 - 5-1/4 4.0 LMD 71 - 75°F 4000/28 18 No Yancey Bivings Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis ~ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 22, 2000 PROJECT: Coppell HiGh School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 19, 2000 CONTRACTOR: Cortez Group TICKET NO.: 3103055 AMBIENT TEMP. (°F): - CONCRETE TEMP. (°F) (ASTM C-1064): 85 TIME BATCHED: 8:11 TIME SAMPLED: 9:10 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3 / 762 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): - WATER ADDED (gal): - SLUMP (in.) (ASTM C-143): 5.5 Sidewalk - Sampled at: Vomitory at A-18 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~/s) TESTED (pounds) .(psi) (psi) CHC 968 7 4-26-00 72000 2550 3000/28 .days CHC 969 28 5-17-00 98600 3490 CHC 970 28 5-17-00 96400 3410 CHC 971 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~71 rl~ r--~ r-~ Curing: Methods: ASTM C-39 Fracture: ,AY....~ v~l vi L.J, B C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/rm , Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: May 22, 2000 Project No.: 0791-2208 SAMPLE DATE: April 19, 2000 CONTRACTOR: Cortez GrouP TICKET NO.: 3103033 AMBIENT TEMP. (°F): 76 CONCRETE TEMP. (°F) (ASTM C.t054): 82 TIME BATCHED: 5:38 TIME SAMPLED: 6:39 WEATHER CONDITION: Overcast LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-23t): WATER ADDED (gal): SLUMP (in.) (AS?M C.143) Sidewalk, sampled at A - 9 X 1 Lattimore 3/1046 38 10 5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12', 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 964 7 04/26/00 75000 2650 3000/28 days CHC 965 28 05/17/00 94300 3340 CHC 966 28 05/17/00 92700 3280 CHC 967 Hold Fracture' mode i's (A) unless otherwis~ noted Specifications: Making & ASTM C-31 Testing ASTM 0-143, Typesof I~ FT'i ['-~ i-'I Cudng: Methods: ASTM C-39 Fracture: AV~ V~I Vi I lB C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo I.a~; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: May 22, 2000 Project No.: 0791-2208 SAMPLE DATE: May 10, 2000 CONTRACTOR: Cortez TICKET NO.: 7086739 AMBIENT TEMP. (°F): 70 CONCRETE TEMP. (°F) (ASTM C.1064): 83 TIME BATCHED: 12:02 TIME SAMPLED: 12:50 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/1093 MIX ID NUMBER: 64 AIR (%) (ASTM C-231): 4.7 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-14~): 4 1/4 Stadium beam and columns, intermediate beam B-20-24, C-20-24 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1032 3 05/13/00 70500 2490 4000~28 days CHC 1033 5 05/15/00 81200 2870 CHC 1034 7 05/17~00 90300 3190 CHC 1035 28 06/07/00 CHC 1036 28 06/07/00 CHC 1037 Hold Fractu~:e mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof r~ m ~---~ [---~ Curing: Methods: ASTM C-39 Fracture: AVXJ I/_...~ VI I lB C D REMARKS: Technician: SMH/rm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford