Loading...
SC-Coppell HS-LR000510FUGRO SOUTH, INC. 2680 Virgo Lane; Dallas, Texa~ 75229 CLIENT: PROJECT: Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Del - Mac Construction Co. Report Date: May 10, 2000 Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: May 4, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days):. Number of cylinders mede: Superplesticizer used: Beam Walls (top wall) - Line D-1 and retaining wall, Line F between Line 20 and Line 24 12:00 p.m. 4:00 p.m. 40 4.0 - 4.5 5+1 Lattimore - Plant No. 2 80 - 85°F 40O0/28 4 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMl-I/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; I~a~-'-~, T'~- Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 10, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 26, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 7086247 89 93 3:20 4:15 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/1039 MIX ID NUMBER: 42 AIR (%) (AS?¥ C-231): WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-143): 5 Raker Beams, Sampled @ D-4.5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER ldays) TESTED (pounds) (psi) (psi) CHC 992 6 05/02/00 90000 3180 4000/28 days CHC 993 7 05/03/00 95000 3360 CHC 994 14 05/10/00 112300 3970 ., CHC 995 28 05/24/00 CHC 996 28 05/24/00 CHC 997 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f ~X~ [/~] ~u Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Mike Flute FUGRO SOUTH INC. Reviewed By: -~'~.~ DaI-Mac Construction - Damon Norman City of Coppetl - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 VE~o Lane; DM!as, T~xa~ 759~9 Ph (972) 484-8301; F~x (972) 820-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: May 10, 2000 PROJECT: Coppell HiGh School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: April 26, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 7086235 89 91 1:24 2:35 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (AS?I~ C.143): Raker Beams, Sampled @ C-3 Lattimore 7/947 42 15 4.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 986 6 05/02/00 85000 3010 4000/28 days CHC 987 7 05t03100 91000 3220 CHC 988 14 05/10/00 104100 3680 CHC 989 28 05/24/00 CHC 990 28 05t24/00 CHC 991 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ 0 [-'] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Mike Flute FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: May 10, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 26, 2000 CONTRACTOR: Cortez Group TICKET NO.: 7086229 AMBIENT TEMP. (°F): 88 CONCRETE TEMP. (°F) (ASTM C-'1064): 90 TIME BATCHED: 12:45 TIME SAMPLED: 1:20 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C-143): Raker Beams, Sampled @ B-1 Lattimore 7~976 42 10 4 3/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches ' TOTAL COMPRESSIVE SPECIFIED CO~iP~ESSlVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 980 6 05/02/00 97000 3430 4000128 days CHC 981 7 05/03/00 100000 3540 CHC 982 14 05/10/00 118200 4180 CHC 983 28 05/24/00 CHC 984 28 05/24/00 CHC 985 Hold Fracture mode is (A) unless o~ie~vise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ [~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Mike Flute FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 VIrgo Lane; Dallas, Taxa~ 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co, Coppell High School, Stadium Expansion Coppell, Texas Report Date: May 10, 2000 Project No.: 0791-2208 DATE PERFORMED: May 8, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Stadium Raker Beams at Gdd Lines 8, 11, 14, 17, 19 following location: and 21 from Line "A" to Line "D" Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 10:00 a.m. 2:30 p.m. 150 4.5 to 5-3/4 5±1 Lattimore - Plant No. 7 85 - 90°F 4000/28 18 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Will/ford