Loading...
SC-Coppell HS-LR000509FUGRO SOUTH, INC. 2880 Virgo Lane; Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 9, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 21, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-t064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Coatez Group 7085976 84 77 1:49 2:30 Clear/Sunny CONCRETE SUPPLIER: Lattimom PLANT/TRUCK: 7 / 947 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): 4.5 WATER ADDED (gal): 15 SLUMP (in.) (AS?M C-~43): 5.0 Grid Line 22-24 at Line "A" CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUM_~ER (days) TESTED (pounds) (psi) (psi) CHC 972 7 4-28-00 56000 1980' 3000/28 days CHC 973 28 5-19-00 CHC 974' 28 5-19-00 CHC 975 Hold 5-19-00 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f ~ [~] [~ E~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Possible Iow 28-day compressive concrete strength results based on 7 day test result. Technician: Bryan Hersley FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford