Loading...
SC-Coppell HS-LR000429FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texa~ 75229 Ph (972) 4848301; Fax (972) 820-7328 CLIENT: PROJECT: OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 29, 2000 Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas DATE PERFORMED: April 25, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Stadium - Slab on Grade - Bathroom A-111 and Mechanical Room A-111 10:00 a.m. 12:30 p.m. 5.0 - 5-1/4 5±1 Lattimore - Plant No. 14 75 - 80°F 3000/28 4 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: '~'~- DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford