Loading...
SC-Coppell HS-LR000428FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 4848301; Fax {972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 28, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 079'1-2208 Coppell, Texas SAMPLE DATE: March 30, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDiTiON: LOCATION OF PLACEMENT: Cortez Group Inc. 7085051 52 78 9:52 11:05 Overcast CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7 / 1040 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): WATER ADDED (gal): 15 SLUMP (in.) (ASTM C-143): 4-1/4 Slab (foundation) Grid A.2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUM_RER (days) TESTED (pounds) (psi) (pal) CHC 784 7 4-6-00 96000 3400 3000/28 days, CHC 785 28 4-27-00 119000 4210 CHC 786 28 4-27-00 117000 4140 CHC 787 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ r-.~ [-'~ [--~ Cudng: Methods: ASTM C-39 Fracture: AIC51 VXJ VI I lB, C D REMARKS: Technician: SMH/mm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: "~- DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppeli lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: April 28, 2000 Project No.: 0791-2208 DATE PERFORMED: April 26, 200 General Contractor: Dal Can Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Rebar Beams at Section 1, Lines 1, 2, 3, 4, 5 by Lines following location: A-(-) 5 to D Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 12:00 5:00 120 4.5 to 5.0 5+1 Lattimore 9O - 93°F 4000/28 18 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: April 28, 2000 Project No.: 0791-2208 SAMPLE DATE: April 19, 2000 CONTRACTOR: Cortez Group TICKET NO.: 3103055 AMBIENT TEMP. (°F): - CONCRETE TEMP. (°F) (ASTM C.1064): 85 TIME BATCHED: 8:11 TIME SAMPLED: 9:10 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3 / 762 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C.143): 5.5 Sidewalk - Sampled at: Vomitory at A-18 ' CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 968 7 4-26-00 72000 2550 3000/28 days CHC 969 28 5-17-00 CHC 970 28 5-17-00 CHC 971 Hold Fracture mode is (A) unless otherwise noted Making & ASTM C-31 Testing ASTM C-143, Typesof r~ r-~ r'--~ r--~ Specifications: Cudng: Methods: ASTM C-39 Fracture: A14.31(..5114_11.--IB C D REMARKS: Technician: Mike Flute SMH/bg Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damor~ Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford