Loading...
SC-Coppell HS-LR000425FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: April 25, 2000 Project No.: 0791-2208 DATE PERFORMED: April 19, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Sidewalk from A - (-) 3 x 1-5 to A-(-) 5 x 19 and Ramps following location: at A-3, A-7 and A-18 Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 6:00 a.m. 9:00 a.m. 70 5- 5.5 5±1 Lattimore - Plant No. 3 80 - 85°F 3000/28 8 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMHtbg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 VIrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 25, 2000 PROJECT: Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: March 27, 2000 CONTRACTOR: Dal Mac TICKET NO.: 7084871 AMBIENT TEMP. (°F): 82 CONCRETE TEMP. (°F) (ASTM C-1064): 74 TIME BATCHED: 1:30 pm TIME SAMPLED: 2:20 pm WEATHER CONDITION: Clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/1045 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 4 Level 1 stadium columns B/20, B/21, B/22, B/23 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 752 7 04/03/00 94000 3330 4000/28 days CHC 753 28 04/24/00 127000 4490 CHC 754 28 04/24/00 129000 4560 CHC 755 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ ~] ~ E] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mark Strittrnatter FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford