Loading...
SC-Coppell HS-LR000419FUGRO SOUTH, INC. 2880 ~.~ Lane; G&;;~, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: Apdl 19, 200o PROJECT: Coppeli High School, Stadium Expansion Project No.: 0791-22o8 Coppell, Texas SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / The Cortez Group 7085511 65 63 12:56 pm 1:40 pm Cloudy/windy CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-23t): WATER ADDED (gal): SLUMP (in.) (ASTM C-143): Columns, 2"d lift D/4 Lattimore 7/956 42 10 7.5O CONCRETE CYLINDER COMPRESSIVE STRENGTH ~ESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) ..... CHC 898 7 04/17/00 93000 3290 4000/28 days CHC 899 28 05/08/00 CHC 900 28 05/08/00 CHC 901 Hold Fracture mode is (A) un!e$~ otherwise n~ied Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ ~ ~-'"~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 ~.~o Lane; Dallas, T~ Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: Apdl 19, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.t0~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / The Cortez Group 7085518 68 71 2:37 pm 3:15 pm Cloudy/windy CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C-143): Beam intermediate 2n~ lift 6+0 Lattimore 7/956 42 0 5.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 902 4 04/14/00 92000 3250 4000/28 days CHC 903 7 04/17/00 96000 3400 ,, CHC 904 28 05/08/00 CHC 905 28 05/08/00 CHC 906 Hold CHC 907 Hold Fracture moGe is (A) unless othenvise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~- ~ OaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dall~, Texas 75229 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppetl lSD, c/o Dal - Mac Construction Co. Report Date: April 19, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppetl, Texas SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.10~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / The Cortez Group 7085525 70 71 3:50 pm 4:55 pm Cloudy/windy CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASl'M C-143): Beam 2nd lift intermediate 6+19 Lattimore 7/761 42 0 4.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 908 4 04/14/00 91000 3220 /28 days CHC 909 7 04/17/00 98000 3470 CHC 910 28 05/08/00 CHC 911 28 05108/00 CHC 912 Hold CHC 913 Hold Fracture mode is (A) unless otherwise noted Specifica,ons: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ m r~~ Cudng: Methods: ASTM C-39 Fracture: AY..51 Y..~l Y_.J I.-JB C D REMARKS: Tech n i cian: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vipgo Lane; Dallas, Taxa~ 75229 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: Apdl 19, 2o0o PROJECT: Coppell High School, Stadium Expansion Project No.: o791-22o8 Coppell, Texas SAMPLE DATE: March 22, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASl'M C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 7084759 76 68 2:31 pm 3:15 pm Cloudy CONCRETE SUPPLIER: Lattimore PLANTFrRUCK: 7/1093 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 5 3/4 Stadium remodel and expansion columns on lines F/10, F/12, G/10 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) , (psi) CHC 736 7 03/29/00 117000 4140 4000/28 days CHC 737 28 04/19/00 143000 5060 CHC 738 28 04/19/00 141000 4990 CHC 739 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~1 r-~ [-'-~ r---~ Curing: Methods: ASTM C-39 Fracture: AE.51 y._~ vi L_JB C D REMARKS: Technician: Dumitru Balas FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD- Mickey Harper SHW Group o Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vi~go Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: April 19, 2000 Project No.: 0791-2208 DATE PERFORMED: April 14, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Stadium Improvements - Pier Caps: C/23, C/24, following location: D/23.5, D/24 Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 2:25 p.m. 2:42 p.m. 5.0 5.5 to 5.5 5.0 Lattimore - Plant No. 7 73.3oF 4000/28 4 No Phillip L. Forrest Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Wiiliford