Loading...
SC-Coppell HS-LR000414FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, cio Dal - Mac Construction Co. Report Date: April 14, 2000 Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas DATE PERFORMED: April 13, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Wall and Columns - 0.5/20.5 to 0.5/22.5 0.5 to B/20.5, B/20.5 to B/22.5 - B/22.5 to 0.5/22.5 11:45 a.m. 6:25 p.m. 120 5.5 to 6.5 5.0 Lattimore - Plant No. 7 66.1 - 77.4°F 4000/28 Mix #.42 12 No Phillip L. Forrest Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon.~rman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, cio Dal- Mac Construction Co. Report Date: April 14, 2000 Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: April 13, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Football Stadium - Slab on Grade at 0.5 to 0.5/18 - A/18 to A/19, 0.5 to B - 0.5/18 to A - A/18 to A/19 and AJ19 to B/19 8:42 a.m. 11:45 a.m. 60 5.5 to 5.5 5.0 Lattimore - Plant No. 7 57.3 - 68.1 oF 3000/28 Mix #16 4 No Phillip L. Forrest Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford