Loading...
SC-Coppell HS-LR000413FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, cio Dal - Mac Construction Co. Report Date: April 13, 2000 Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: April 10, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Bleachers for Stadium - Second level of beams and columns for bleachers 1:30 p.m. 5:30 p.m. 130 7.5 to 4.5 5.0 Lattimore - Plant No. 7 63 - 71°F 4000/28 16 No Yancey Divings Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford