SC-Coppell HS-LR000410FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Stadium Expansion
Coppell, Texas
Report Date: Apdi 10, 2000
Project No.: 0791-2208
DATE PERFORMED: April 6, 2000
General Contractor: Dal-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
Football Stadium Improvements - Column B/18, Wall
0.5/15.1 to 0.5/M.3, 0.5/17.3 to Line B. 0.5/18.4 to Line
B, 0.5/18.4 to 19.5, A.2/17.3 to A.2/18.4
12:10 p.m.
2:25 p.m.
40
5-3/4 to 6.0
5.0
Lattimore
74.6 - 76.8°F
4000/28
4
No
Phlllip L. Forrest
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford