Loading...
SC-Coppell HS-LR000404FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: April 4, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: March 27, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-10e4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Center Group 3101742 CONCRETE SUPPLIER: Lattimore 76.6 PLANT/TRUCK: 3/830 72.7 MIX ID NUMBER: 16 10:37 am AIR (%) (ASTM C-23'1): 1 11:30 am WATER ADDED (gal): 0 Clear SLUMP (in.) (ASTla C-t45): 6.50 Piers: A/l, AJ2, A/3, B/l, BI2, BI3, C/1, Cl2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 748 7 04/03/00 82000 2900 3000/28 days CHC 749 28 04/24/00 CHC 750 28 04/24/00 CHC 751 Hold " Fracture mode is (A) unless otherwise noted Spedflcations: Making & ASTM C-31 Testing ASTM C-143, Types°f ~] [~ [~ D Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Eimore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 vIrgo Lane; Dallas, Texas 75229 Ph (972)484-8301: Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppeli High School, Tennis Court/Parking Lot Coppell, Texas Report Date: Apr, 4, 2000 Project No.: 0791-2208 SAMPLE DATE: March 24, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDmON: LOCATION OF PLACEMENT: Tri Dal CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C.143): 10 Foot outlet east side of tennis court parking lot CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 780 7 03/31/00 111000 3930 3000/28 days CHC 781 28 04/21/00 CHC 782 28 04/21/00 CHC 783 Hold Fracture mode is (A) unless otherwise noted Specifications: Making& ASTM C-31 Testing ASTM C-143. Types of ~ [~ [~ D Curing: IVlel~ods: ASTM c-3g Fracture: A B C , D REMARKS: Cylinders cast by Contractor. All information except test data furnished by contractor and assumed to be correct. Technician: SMH/rm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Daflas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: Apd~ 4, 2000 Project No.: o791-22o8 SAMPLE DATE: March 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-lO~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac 31O1868 82.1 78:4 1:35 pm 2:40 pm Clear/windy Piers: fiG, and CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/1096 MIX ID NUMBER: 16 AIR (%) (ASlla C-231): 3 WATER ADDED (gal): 0 SLUMP (in.) (ASWa C-143): 6 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inchee TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~s) TESTED (pounds) (psi) (psi) , , CHC 776 7 04/04/00 88000 3110 3000/28 days CHC 777 28 04/25/00 CHC 778 28 04/25/00 CHC 779 Hold Fracture mode i$ (A) unless otflefwtse noted Spedflcalfons: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] p~] [~1 r--] cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: .~, DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Wiiliford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, cio Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: Apr, 4, 2000 Project No.: 0791-2208 SAMPLE DATE: March 27, 2000 CONTRACTOR: Dal Mac TICKET NO.: 7084871 AMBIENT TEMP. (°F): 82 CONCRETE TEMP. (°F) (ASTM C.1064): 74 TIME BATCHED: 1:30 pm TIME SAMPLED: 2:20 pm WEATHER CONDITION: Clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/1045 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 4 Level 1 stadium columns BI20, B/21, B/22, B/23 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 752 7 04/03/00 94000 3330 4000/28 days CHC 753 28 04/24/00 CHC 754 28 04/24/00 CHC 755 Hold Fracture mode is (A) unless othenvise noted Specifications: Making & ASTM C-31 Testing ASTM 0-143, Typesof ~ r]-] ~-~ r-.-~ Curing: Methods: ASTM C-39 Fracture: AI/~ V~ VI I lB C D REMARKS: Technician: Mark Strittmatter FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppetl - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppetl lSD, c/o Dal- Mac Construction Co. Coppeil High School, Tennis CourlJParking Lot Coppell, Texas Report Date: April 4, 200O Project No.: 0791-2208 SAMPLE DATE: March 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-t064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Texas Tennis 1541410 82 83 1:20 pm 2:00 pm Partly cloudy CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/835 MIX ID NUMBER: 8272 AIR (%) (ASWa C.231): 5 WATER ADDED (gal): 0 SLUMP (in.) (AsWa c.143): 5.50 Slab on grade for Tennis Court #10, sampled at 15 feet west, 15 feet north of southeast comer CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 772 4 04/01/00 79000 2790 3500/28 days CHC 773 7 04/04100 CHC 774 28 04/25/00 CHC 775 Hold FraCtUre mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM 0-143, Types°f ~] [~ ~;] r--] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Jose Rivera SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. mil 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: Apri; 4, 2000 Project No.: o791-2208 SAMPLE DATE: March 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-10S4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dai Mac / Trans Texas Tennis 1541337 82 85 12:43 pm 1:30 pm Partly cloudy CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/809 MIX ID NUMBER: 8272 AIR (%) (ASTM C-231): 3.0 WATER ADDED (gal): 6 SLUMP (in.) (ASTM C-143): 6 Slab on grade for Tennis Court #10, sampled at 30 feet south, 20 feet west of northeast comer CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 768 7 04/01/00 75000 2650 3500/28 days CHC 769 28 04/04/00 CHC 770 28 04/25/00 CHC 771 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 T.ting ASTM C-143, Typesof ~;;~ ~'] ~'~ r--] Curing: Methods: ASTM C-39 Fracture: AV~J I/~,J I/'1 L.JB c D REMARKS: Technician: Jose Rivera FUGRO SOUTH INC. SMH/rrn Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 4, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: March 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.t0~4): TiME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Texas Tennis 1541203 CONCRETE SUPPLIER: TXI 82 PLANT/TRUCK: 41/526 84 MIX ID NUMBER: 8272 12:22 pm AIR (%) (AST~ C-23t): 4.5 1:10 pm WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C-~,~): 5 3/4 Slab on grade for Tennis Court #10, sampled at 20 feet east, 20 feet south of northwest comer CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) ,(l~i) CHC 764 7 04/01/00 70000 2480 3500/28 days CHC 765 28 04/04/00 CHC 766 28 04/25/00 CHC 767 Hold Fracture ,TrOGe is (A) unless o~,e,-,~1~ nu~G Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f ~ [~[~I D Cudng: Methocls: ASTM C-39 Fracture: A B G D REMARKS: Technician: Jose Rivera FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford