Loading...
SC-Coppell HS-LR000328FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 GENERAL REPORT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: March 28, 200 Project No.: 0791-2208 DAILY ACTIVITY REPORT: March 27, 2000 Services Performed: Weather Conditions: Contractors on Site: Visual Inspection Clear DaI-Mac Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: Observed concrete placement and cast one set of four concrete test cylinders to represent placement of concrete on this date. Mark Strittmatter Fugro South Technician SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Eirnore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. Sr. Project Manager FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF MORTAR CUBES Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: March 28, 2000 Project No.: 0791-2208 SAMPLE DATE: February 28, 2000 Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: Dal Mac ASTM C-109 Area E Type S Time Sampled: SAMPLE . AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) {psi) . . CHC 13 7 03/06/00 4.0 4260 1070 1800/28 CHC 14 7 03~06~00 4.0 3850 960 CHC 15 7 03/06/00 4.0 4120 1030 CHC 16 28 03/27/00 4.0 7840 1960 CHC 17 28 03/27/00 4.0 7990 2000 CHC 18 28 03/27/00 4.0 7230 1810 Remarks: Ambient temperature 62° Mortar temperature 74° Thomas Cranford Technician FUGRO SOUTH INC. SMH/rm Distribution: DaI-Mac Construction - Damon Norman · City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: __~'"~ FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: March 28, 2000 Project No.: 0791-2208 DATE PERFORMED: March 27, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Columns: Level I Stadium Columns: A/20, A/21, A/22, Ag23, A/24, B/20, B/21, B/22, B/23, B/24, C/20, C/21, C/22, D/20, D/21, D/22 2:00 p.m. 4:30 p.m. 38 4.0 to 5.0 5.0 Lattimore - Plant No. 7 74 - 76°F 4000/28 4 No Mark Strittmatter Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford