SC-Coppell HS-LR000327FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484.8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Coppell lSD, c/o Dal- Mac Construction Co. REPORT DATE: March 27, 2000 Coppell High School, Stadium Expansion, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: March 17, 2000 Density Test Method: Number 1 2 ASTM D-2922 & 30t7 MOISTURE/DENSITY RELATIONS Material Description Maximum Dry Density (pcf) Reddish brown clayey sand (Select) 116.9 Red brown sandy clay 118.6 TEST PROCTOR NO. NO. 198 1 Method of Compaction: ASTM D-698 Building Subgrade, C.5-4, north A-118 south of concession stand, final Retest of Test #196 dated 3-15-00 Electric Line Backfill at Tennis Court, 25 feet north of curb in front of Court #11, north of drive into tennis court, final Proctor Results Optimum Moisture (%) 13.5 12.4 199 1 200 2 TEST RESULTS LOCATION UN~ DRY MOISTURE WEIGHT CONTENT PERCENT 117.6 PERCENT OF MAXIMUM DENSITY 11.8 100.6 117.5 11.5 100.5 113.6 14.5 95.8 Remarks: All densities meet project specifications unless otherwise noted. Mike Flute Fugro South Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: 'El FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: March 27, 2000 Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas DATE PERFORMED: March 17, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Columns and grade beam tie-in - Columns: F-7, F-9, D-6, D-8, C-6, C-8, C-17, C-19, C-21, D-14, D-15, D-19, D-21, B-21, B-19, A-21 & tie-in beam line C1-D1 12:00 noon 2:00 p.m. 35 5-3/4 to 6-1/4 5-J:1 Lattimore - Plant No. 7 65 - 70°F 4000/28 4 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Creddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: March 27, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 coppell, Texas SAMPLE DATE: March 17, 2000 CONTRACTOR: Sizelove TICKET NO.: 7084630 AMBIENT TEMP. (°F): 56 CONCRETE TEMP. (°F) (ASTM C-10S4): 67 TIME BATCHED: 11:25 TIME SAMPLED: 12:20 WEATHER CONDITION: Overcast LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7 MIX ID NUMBER: 42 AIR (%) (ASTM C-231): WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-143): 6 1/4 Columns for stadium, sampled at Column C-17 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 equare inchee TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER {days) TESTED (pounds) (Psi) (Psi) .... CHC 732 7 03/24/00 116000 4100 4000/28 days CHC 733 28 04/14/00 CHC 734 28 04/14/00 CHC 735 Hold Fracture mode is (A) unless otherwise' noted Specifications: Making & ASTM C-31 T. ting ASTM C-143, Typesof r~ r-~ F-~ n Cudng: Methods: ASTM C-39 Fracture: Av~ v~j vi i lB C D REMARKS: Technician: Mike Flute SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford