Loading...
SC-Coppell HS-LR000322FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: March 22, 2000 Project No.: 0791-2208 SAMPLE DATE: February 22, 2000 CONTRACTOR: TICKET NO.: 3099911 AMBIENT TEMP. (°F): 79 CONCRETE TEMP. (°F) (ASWa C-10S4): 76 TIME BATCHED: 2:00 TIME SAMPLED: 2:45 WEATHER CONDITION: O/C & Breezy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/735 MIX ID NUMBER: 16 AIR (%) (ASWa C-231): WATER ADDED (gal): 0 SLUMP (in.) (AsWa c.143): 6 1/4 Grade beams, sampled at B-11 Area CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 652 7 02/29/00 89000 3150 3000/28 days CHC 653 28 03/21/00 115000 4070 CHC 654 28 03/21/00 113000 4000 CHC 655 Hold Fracture mode is (A) unless otherwise notegl Speciflcalions: Making & ASTM C-31 Tes,ng ASTM C-143, Typesof [~ ~] ~ ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c. Jo Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: March 22, 2000 Project No.: 0791-2208 SAMPLE DATE: March 13, 2000 CONTRACTOR: TICKET NO.: , AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTra C-10S4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group, Inc. 3100918 CONCRETE SUPPLIER: Lattimom 69 PLANT/TRUCK: 3/834 74 MIX ID NUMBER: 16 3:29 AIR (%) (ASTM C-23t): 4:00 WATER ADDED (gal): 0 Warm SLUMP (in.) (ASTM C.143): 4 3/4 Grade beam, grid line A-20 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYENDER AGE DATE LOAD STRENGTH STRENGTH NUMBER , (da}~$) TESTED (pounds) (p~i) (psi) CHC 724 7 03/20/00 87000 3080 3000/28 days CHC 725 28 04/10/00 CHC 726 28 04/10/00 CHC 727 Hold Fracture mode is (A) ~nless otherwise noted Speclflcatl°ns: Making & ASTM C'31 T"ting ASTM C'143, Types°f ~1 l~! l~ D Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, cio Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: March 22, 2000 Project No.: 0791-2208 SAMPLE DATE: March 14, 2000 CONTRACTOR: Cortez TICKET NO.: 84338 AMBIENT TEMP. (°F): 89 CONCRETE TEMP. (°F) (Aswa C.10s4): 76 TIME BATCHED: 12:20 TIME SAMPLED: 2:00 pm WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/938 MIX ID NUMBER: 42 AIR (%) (ASwa C-231): WATER ADDED (gal): SLUMP (in.) (ASwa C.143): 5.5 Stadium seating, grade beam @ B and A @ 24 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 728 7 3-21-00 97000 3430 4000/28 days ,,, CHC 729 28 4-11-00 CHC 730 28 4-11-00 CHC 731 Hold Fracture mode i$ (A) Unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof I~ r"[-] i~1 r"-1 Curing: Methods: ASTM C-39 Fracture: AVU I/~J VI I lB C D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/mm Distribution: Reviewed By: ~ - Dal-Mac Construction - Damon/Norman City of Coppell - Larry Davis ~ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford