SC-Coppell HS-LR000306FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Stadium Expansion
Coppell, Texas
Report Date: March 6, 2000
Project No.: 0791-2208
DATE PERFORMED: March 3, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Exterior Wall and Column from 4.5 - (-) 5 to Line C-2
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
2:00
4:00
30
5.0 - 5.5
5+1
Lattimore Plant No. 7
63 - 69°F
4000/28
4
No
Mike Flute
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 virgo Lane; Dallas. Texas 75229
Ph (972)484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF GROUT
CLIENT:
PROJECT:
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Stadium Expansion
Coppeil, Texas
Report Date: March 6, 2000
Project No.: 0791-2208
SAMPLE DATE: February 24, 2000
General Contractor:
Method of Test:
Sample Location:
Results / Remarks:
Dal Mac
ASTM C-109
GH-FI Line, Area G
SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED
NUMBER TESTED LOAD STRENGTH STRENGTH
(days) (sq. in.) (lbs.) (psi) (psi/days)
CHC 1 7 03/02/00 7.07 18420 2610 2500~28
CHC 2 28 03/23/00
CHC 3 28 03/23/00
CHC 4 Hold
Remarks:
Mike Flute
Fugro South Technician
FUGRO SOUTH INC.
SMH/rm
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHVV Group - Mike Elmore
JRJ Paving - Jeff Williford
Reviewed By:
FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co. Report Date: March 6, 2000
Coppell High School, Stadium Expansion Project NO.: 0791-2208
Coppell, Texas
DATE PERFORMED: March 3, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Grade Beam - Line D - 5 to 12 and Line C - 5 to 16
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
4:OO
6:00
36
5.5 to 5-3/4
5±
Lattimore - Plant No.7
65 - 70°F
3000/28
4
No
Mike Flute
Fugro South Technician
FUGRO SOUTH, INC.
SMh/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford