SC-Coppell HS-LR000306FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: March 6, 2000 Project No.: 0791-2208 DATE PERFORMED: March 3, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Exterior Wall and Column from 4.5 - (-) 5 to Line C-2 following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 2:00 4:00 30 5.0 - 5.5 5+1 Lattimore Plant No. 7 63 - 69°F 4000/28 4 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 virgo Lane; Dallas. Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppeil, Texas Report Date: March 6, 2000 Project No.: 0791-2208 SAMPLE DATE: February 24, 2000 General Contractor: Method of Test: Sample Location: Results / Remarks: Dal Mac ASTM C-109 GH-FI Line, Area G SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) CHC 1 7 03/02/00 7.07 18420 2610 2500~28 CHC 2 28 03/23/00 CHC 3 28 03/23/00 CHC 4 Hold Remarks: Mike Flute Fugro South Technician FUGRO SOUTH INC. SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHVV Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: March 6, 2000 Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas DATE PERFORMED: March 3, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Grade Beam - Line D - 5 to 12 and Line C - 5 to 16 following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 4:OO 6:00 36 5.5 to 5-3/4 5± Lattimore - Plant No.7 65 - 70°F 3000/28 4 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMh/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford