SC-Coppell HS-LR000303 (2)FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Tex~__~ 75~29
CLIENT:
PROJECT:
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, cio Dal - Mac Construction Co. Report Date: March 3, 2000
Coppell High School, Stadium Expansion Project No.: 0791-2208
Coppell, Texas
DATE PERFORMED: March 1, 2000
General Contractor: Cortez Group
Method of Test: Applicable ACl Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
Grade Beam on Stadium - Grid Line D-3 and Grid Line
D
5:00
6:00
4.5 to 5.0
5.0
Lattimore - Plant No. 3
80 - 82°F
3000/28
4
No
Thomas Cranford
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford