Loading...
SC-Coppell HS-LR000303 (2)FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Tex~__~ 75~29 CLIENT: PROJECT: Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, cio Dal - Mac Construction Co. Report Date: March 3, 2000 Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: March 1, 2000 General Contractor: Cortez Group Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Grade Beam on Stadium - Grid Line D-3 and Grid Line D 5:00 6:00 4.5 to 5.0 5.0 Lattimore - Plant No. 3 80 - 82°F 3000/28 4 No Thomas Cranford Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford