Loading...
SC-Coppell HS-LR000225FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, cio Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 25, 2000 Project No.: 0791-2208 DATE PERFORMED: February 24, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Grade Beam - Stadium - Line A-5 to Line B and Line 6 following location: to Line 17.3 Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 1:00 p.m. 3:00 p.m. 60 5.0 to 5.5 5+1 Lattimore - Plant No. 3 70 - 75°F 3000/28 4 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 25, 2000 Project No.: 0791-2208 DATE PERFORMED: February 24, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Exterior Wall - South exterior wall - East Half following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superpiasticizer used: 4:OO 6:00 6O 5.0 to 5.5 5+1 Lattimore - Plant No. 3 70 - 75°F 4000/28 4 No Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford