SC-Coppell HS-LR000225FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, cio Dal - Mac Construction Co.
Coppell High School, Stadium Expansion
Coppell, Texas
Report Date: February 25, 2000
Project No.: 0791-2208
DATE PERFORMED: February 24, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Grade Beam - Stadium - Line A-5 to Line B and Line 6
following location: to Line 17.3
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
1:00 p.m.
3:00 p.m.
60
5.0 to 5.5
5+1
Lattimore - Plant No. 3
70 - 75°F
3000/28
4
No
Mike Flute
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Stadium Expansion
Coppell, Texas
Report Date: February 25, 2000
Project No.: 0791-2208
DATE PERFORMED: February 24, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Exterior Wall - South exterior wall - East Half
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superpiasticizer used:
4:OO
6:00
6O
5.0 to 5.5
5+1
Lattimore - Plant No. 3
70 - 75°F
4000/28
4
No
Mike Flute
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford