SC-Coppell HS-LR000223FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 820-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 23, 2000
Coppell High School, Stadium Expansion Project No.: 0791-2208
Coppell, Texas
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Grade beams for Stadium
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
2:00 p.m.
4:30 p.m.
50
5.0 - 6-1/4
5-Zl
Lattimore - Plant No. 3
75 - 80°F
3000/28
4
No
Mike Flute
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis /
Coppell lSD -Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford