Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SC-Coppell HS-LR000221
FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas. Texas 75229 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dai - Mac Construction Co. Report Date: February 21, 2000 PROJECT: CoPpell High School, Stadium Expansion Project No,: 0791-2208 Coppell, Texas SAMPLE DATE: February 11, 2000' CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.10S4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Cortez Group 7083387 CONCRETE SUPPLIER: Lattimore 50.9 PLANT/TRUCK: 7/755 58.3 MIX ID NUMBER: 16 8:09 am AIR (%) (ASTM C-23t): 2 8:50 am WATER ADDED (gal): 0 P/C Windy SLUMP (in.) (ASl~ C-143): Piers: H/24.9, F.5/25.4, F.3/24.9, E/25.3, D.9/25 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRE$~VE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (p~i) CHC 608 7 02118/00 94000 3330 3000/28 days CHC 609 28 03/10/00 CHC 610 28 03110100 CHC 611 Hold Fracture mode is (A) unless ~ noled Speciflcattofts: Making & ASTM C-31 Tesling ASTM C-143, Types°f [~ [~] [~1 F"] Curing: Melhods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: f ~ DaI-Mac Construction - Damon Norman City of Coppeli - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford --~r FUGRO SOUTH, INC. 2880 Vlrgo Lane; Da#as, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 21, 2000 PROJECT: Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: January 21, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.t064)'. TIME BATCHED: TIME SAMPLED: WEATHER CONDmON: LOCATION OF PLACEMENT: The Cortez Group 3098054 6O 72 12:54 1:45 Clear CONCRETE SUPPLIER: Latttmore PLANT/TRUCK: 3 ! 1046 MIX ID NUMBER: (38) AIR (%) (~sl~ c-231): 4.6 WATER ADDED (gal): 20 SLUMP (in.) (~1~ c.143): 5.0 Paving - Parking lot behind Stadium - Southeast comer - Section Patch - Directly behind batting cage CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12', 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESS'YE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 500 7 01-28-00 80000 2830 3000/28 days CHC 501 28 02-18-00 102000 3810 CHC 502 28 02-18-O0 100000 3540 CHC 503 Hold Fracture iT.~e is (A) ur,.,~..; o~,~r~ ~ Specifications: Making& ASTMC-31 Testing ASTMC-143, Types of [~ ~ [~ E] Curing: Methods: ASTM C-39 Fracture: A ,, B , C , D REMARKS: Technician: SMH/rm Distribution: Greg Forsythe FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford