Loading...
SC-Coppell HS-LR000217FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972)620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (AST~ C-10~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac I Cortez Group 7083266 53.4 57.2 8:23 am 9:05 am PiC & Windy Piers: F/12, G/12 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/786 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 2 WATER ADDED (gal): 0 SLUMP (in.) (AST~ C.t43): 5.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 576 7 02/16100 86000 3040 3000/28 days CHC 577 28 03~08~00 CHC 578 28 03/08/00 CHC 579 Hold F~ackn'e mode is (A) ~,-,~,~ c,~,~,-..;~, Making & ASTM 0-31 Testing ASTM C-143, Typesof r~ m r-~ r-- Specifications: Curing: Methods: ASTM C-39 Fracture: Ay...~ v~J vi L..JB C REMARKS: Technician: Phillip Forrest SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane: Dallas, Texas 75229 Ph (97'2) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 17, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (AS~ C-10~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Cortez Group 3899034 72.1 66.1 4:16 pm 4:56 pm PIC & Windy Piers: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/972 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 3 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5 B.3/3.5, B/3.5, CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER {days) TESTED (pounds) (psi) (psi) CHC 580 7 02116100 96000 3400 3000/28 days CHC 581 28 03/08/00 CHC 582 28 03/08/00 CHC 583 Hold Fracture mode is (A) urdees olhem~e noted Specifications: Maldng & ASTM C-31 Testing ASTM C-143, Types of Curing: Melhods: ASTM C-39 Fract~e: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppetl lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i 2880 Virgo I.a~e; Dallas, Taxa~ 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (AST~I C.10e4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Cortez Group 7083266 53.4 57.2 8:23 am 9:05 am PIC & Windy Piers: F/12, GI12 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/786 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 2 WATER ADDED (gal): 0 SLUMP (in.) (As?¥ c.143): 5.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 576 7 02116/00 86000 3040 3000128 days CHC 577 28 03/08100 CHC 578 28 03108/00 CHC 579 Hold Fracture mode is (A) unless olherwise noted Specifications: Making& A STM 0-31 T.ttng A~TM C-143, Types of [~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore J RJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texa~ 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17. 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac I Cortez Group 3899034 CONCRETE SUPPLIER: Lattimore ,. 72.1 PLANT/TRUCK: 3/972 66.1 MIX ID NUMBER: 16 4:16 pm AIR (%) (ASTM C-231): 3 4:56 pm WATER ADDED (gal): 0 PIC & Windy SLUMP (in.) (ASTM C-143): 5 Piers: B.313.5, B/3.5, A/1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (1~, i) CHC 580 7 02/16/00 96000 3400 3000/2,8 days CHC 581 28 03/08/00 ..' CHC 582 28 03/08100 CHC 583 Hold Fracture mede is (A) unless oUterwt~ holed Specifications: Making & ASTM C-31 T.,ng ASTM C-143, Types of ~ ~ [~] E] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By:... ~ .~_.~-- DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vtrgo Lane; Da#aa, Taxa~ 75229 Ph (972) 484-6301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppe~l lSD, c/o Dal - Mac Construction Co. Report Date: February 17, 2000 PROJECT: Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac ! Cortez Group 7083266 53.4 57.2 8:23 am 9:05 am P/C & Windy Piers: FI12, G/12 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/786 MIX ID NUMBER: 16 AIR (%) (ASTM C-2-~1): 2 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27' aquare Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STREHGTH NUMBER (days) , TESTED (pounds) (psi) CHC 576 7 02/16100 86000 3040 3000/28 da)~s CHC 577 28 03108100 CHC 578 28 03108100 CHC 579 Hold Making & ASTM C-31 Testing ASTM C-143, Type$of ~ r'~ [-~ r--~ Specifications: Curing: Melhods: ASTM C-39 Fracture: AIf.51 v~ vi I...JB C REMARKS: Technician: Phillip Forrest SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vkgo Lane; Dallas, Tsxa~ 75229 Ph (972) 4846301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTU C.t0S4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac I Cortez Group 3899034 72.1 66.1 4:16 pm 4:56 pm PIC & Windy Piers: CONCRETE SUPPLIER: Lattlrnore PLANT/TRUCK: 3/972 ,J~tX ID NUMBER: 16 AIR (%) (ASTM C-231): 3 WATER ADDED (gal): 0 SLUMP (in.) (A. STM C.143): 5 B.313.5, B/3.5, A/1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches ..:.TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 580 7 02/16100 96000 3400 3000/28 days CHC 581 28 03/08100 ..' CHC 582 28 03~08~00 CHC 583 Hold Fracture mode is (A) unles~ o~'terwise notod Speciflcatlons: Making & ASTM C'31 Testing ASTM C-143. Typesof ~ ~ ~ D Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2~80 Virgo Lmm; Dm#am. Tex~ 75229 Ph (972) 4~4-6301; F~x (972) 620-7326 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17. 2OO0 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac I Cortez Group 7083266 CONCRETE SUPPLIER: Lattimore 53.4 PLANT/TRUCK: 7/786 57.2 MIX ID NUMBER: 16 8:23 am AIR {%) (ASTM C-23t): 2 9:05 am WATER ADDED (gal): ~ 0 P/C & Windy SLUMP (In.) (AS'rM C.143): 5.50 Piers: FI12, C-d12 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS - Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) ,, (psi) CHC 576 7 02/16100 86000 3040 3(X)0/28 dal/s CHC 577 28 03108/00 CHC 578 28 03108/00 CHC 579 Hold Fracture mode is (A) unless olhetwise noMd Specifications: Making & ASTM C-31 Testing ASTM 0.143, TYpeSof ~ m i'-/i i'-I Curing: Melhods: ASTM C-39 Fracture: AV~ V~ VI LJB c D REMARKS: Technician: SMH/rm Distribution: Philtip Forrest FUGRO SOUTH INC. Reviewed By: ~ -- DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Taxa~ 75229 Ph (9?2) 484-8301; Fax (972) 620-?328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: Dal Mac I Cortez Group TICKET NO.: 3899034 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): '72.1 PLANT/TRUCK: 3/972 CONCRETE TEMP. (°F) (ASTM C.1064): 66.1 MIX ID NUMBER: 16 TIME BATCHED: 4:16 pm AIR (%) (ASTU C-23t): 3 TIME SAMPLED: . .' 4:56 pm WATER ADDED (gal): 0 WEATHER CONDITION: PIC & Windy SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: Piers: B.313.5, B/3.5, A/1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (l~i) CHC 580 7 02116/00 96000 3400 3000/28 da)~s CHC 581 28 03/08/00 .., CHC 582 28 03/08/00 CHC 583 H~d Fracture mode is (A) unles~ ~ noted Specfficali°n$: Maidng & ASTM C'31 Te~ting ASTM C'143. TYpesof ~] [~ [~ D Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2680 Vlrgo Lane; Dalla~, Texas 75229 Ph (912) 464-6301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: .... ~' Dal Mac I Cortez Group 7083266 53.4 57.2 8:23 am 9:05 am PIC & Windy Piers: FI12, GI12 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/786 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 2 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-t43): 5.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPREE$1VE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) "TESTED (pounds) (psi) (psi) CHC 576 7 02/16100 86000 3040 3000/28 days CHC 577 28 03/08/00 .' CHC 578 28 03/08/00 CHC 579 Hold ' Fracture mode is (A) ~ °~hen~ae nord Speciflcatl°ns: Making & ASTM C'31 Testing A~TM C'143, T~e$~ ~ ~ [~D Curing: Melhods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Philltp Forrest FUGRO SOUTH INC. SMl-I/rm Distribution: Reviewed By: ~ - DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2680 Vkgo Lane; Da&al. Texas 75229 Ph (972) 464..8,101; Fax (972) 620,-7326 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppall, Texas Report Date: Felxuary 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASWa C.1OS4): TIME BATCHED: · TIME SAMPLED: WEATHER CONDITION: "' LOCATION OF PLACEMENT: ' Dal Mac I Cortez Group 3899034 CONCRETE SUPPLIER: Lattimore 72.1 PLANT/TRUCK: 3/972 66.1 MIX ID NUMBER: 16 4:16 pm . .... AIR (%) (ASWa C-231): 3 4:56 pm WATER ADDED (gal): 0 P/C & Windy SLUMP (in.) (AS?M C-14~): 5 Piers: B.3/3.5, B/3.5, N1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28~7 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~/s) TESTED (pounds) (psi) (psi) CHC 580 7 02/16/00 96000 3400 3000/28 da)fs CHC 581 . 28 03/08/00 ... CHC 582 28 03/08/00 CHC 563 Hold Fracture mode is (A) ufllell olll~wile nolld Specifications: IVl~lng & ASTM C-31 Testing ASTM C-1430 Type~°~ ~3 [~] I~1 D Cudng: Methods: ASWa C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell. Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.10e4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac I Cortez Group 7083266 53.4 57.2 8:23 am 9:05 am PIC & Windy Piers: FI12, G/12 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/786 MIX ID NUMBER: 16 AIR (~{~) (ASTM C-2:~1): 2 WATER ADDED (gal): 0 SLUMP (in.) (ASTla C.143): 5.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED,. (pound~) (psi) (psi) , ,, CHC 576 7 02/16/00 86000 3040 3000/28 da)~s . CHC 577 28 03/08100 CHC 578 28 03/08/00 CHC 579 Hold Fracture mode is (A) urde~s olhen~ise noted Specifications: Making& ASTM C-31 Testing ASTM C-143, Types of ~] Cudng: Methods: ASTU C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Wiiliford FUGRO SOUTH, INC. i 2880 Vir0o Lane; Dadliil. Taxa~ 75229 Ph (972) 484-8,101; Fax (972) 620..7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-22o8 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. CONCRETE TEMP. (°F) (ASTM C-t0S4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: ..... Dal Mac I Cortez Group 3899034 72.1 66.1 4:16 pm 4:56 pm P/C & Windy Piers: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/972 MIX ID NUMBER: 16 AIR (%) (ASWa C-231): 3 WATER ADDED (gal): 0 SLUMP (in.) (AST¥ C.143): 5 B.3/3.5, BI3.5, N1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED CO~PRE$81VE CYLINDER AGE DATE LOAD STRENGTH ** STRENGTH NUMBER (days) TESTED (pounds) (psi) (1~1) CHC 580 7 02116/00 96000 3400 3000/28days .. CHC 581 28 03/08100 CHC 582 28 03108/00 CHC 563 Hold Fracture mode la (A) untes~ oltmnvtse noMd Speciflcatl°ns: Idaldng & ASTM C'31 Te'Ung ASTM C'143. Type~of ~] [~ [~1 D Curing: Melhods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: ~ ~ Dal-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i 2880 Vtrgo Lane; Dallas. Taxam 75229 Ph (972) 484-8,,t01; Fax (972) 820-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: Felxuary 17, 2000 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-t0~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Cm'tez Group 7083266 53.4 57.2 8:23 am 9:05 am PIC & Windy Piers: FI12, GI12 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/786 MIX ID NUMBER: 16 AIR (%) {AsTt~ c.231): 2 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5.50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRE~81VE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 576 7 02/16100 86000 3040 3000/28 da~pa CHC 577 28 03108100 .*' CHC 578 28 03108100 CHC 579 Hold Fracture mode is (A) untes~ olhelIMee holed Curing: Melhod$: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: ~ - DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2__~0_ Viqlo Lane; DJaaJ. Tex~ 75229 (972),1~14,101; Fax (972) COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Oal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2O00 Project No.: 0791-2208 SAMPLE DATE: February 9, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (AST~ C.lOe4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT:. Dal Mac I Cortez Group 3899034 72.1 66.1 4:16 pm 4:56 pm PIC & Windy Piers: CONCRETE SUPPLIER: Latttmore PLANT/TRUCK: 3/972 MIX ID NUMBER: 16 AIR (%) (ASTM C.231): 3 WATER ADDED (gal): 0 SLUMP (In.) (ASTra C-143): 5 B.3/3.5, B/3.5, A/1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESE~fE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (1~i) CHC 560 7 02/16/00 96000 3400 3000/28 ,days CHC 561 28 03/08100 .., CHC 562 28 03108/00 CHC 563 Hold Fractu~ mode ~ (x) un~e~ o~=va, e hems Sper-'iflcalt°n$: Making & ASTM C'31 Tes#ng ASTM C'143, Type~°f ~] [~ [~1 D Curing: Idethods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By:.. DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i CLIENT: PROJECT: 2880 Vir~,o Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 GENERAL REPORT Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 17, 2000 Project No.: 0791-2208 DAILY ACTIVri'Y REPORT: February 15, 2000 Services Performed: Visual Inspection Weather Conditions: Partly Cloudy Contractors on Site: Cortez Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: · On-site fill material has a lot of roots and large pieces of trees, Tri Del dozer operator said he would get a separator to remove it. Test taken were approximately 6 feet below grade in natural ground and had only a few roots but other excavated material was not acceptable for use as fill unless organics removed. David Putman Fugro South Technician FUGRO SOUTH, INC. David A. Belcher, P.E. Sr. Project Manager SMH/bg Distribution: DaI-Mac Construction - Damon ~rman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 17, 2000 Coppell High School, Stadium Expansion Project NO.: 0791-2208 Coppell, Texas DATE PERFORMED: February 15, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Stadium seating - Retaining wall - 30 feet east of Grid following location: Line A Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump. required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 12:00 2:00 4.0 TO 5.0 5.0 Lattimore - Plant No. 3 77 - 79°F 4000/28 4 No David Putman Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford