Loading...
SC-Coppell HS-LR000216FUGRO SOUTH, INC. i 2880 ~ lane; Dallas. Tax~ 75229 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: Febnmry 16, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 8, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.10S4): TIME BATCHED: TiME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac I Cortez Group 3098864 CONCRETE SUPPLIER: Lattimore 49.8 PLANT/TRUCK: 3/964 54.7 MIX ID NUMBER: 16 8:03 am AIR (%) (ASTU C.~,3t): 3.0 8:40 am WATER ADDED (gal): 0 Clear SLUMP (in.) (As'r~a c-t43): 6 Pier: B/24.5, Q.5/8, B/24.1, B24.4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 568 7 02115100 103000 3640 3(X)0/28 days CHC 569 28 03/07100 CHC 570 28 03107/00 CHC 571 Hold Fracture mode I$ (A) unless Ou~wi~e ~ Specifications: Making & ASTM C-31 Tesling ASTM C-143, Typesof ~ [~] ~] ~ Cudng: Methods: ASTM C.39 Fracture: A B C D REMARKS: Technician: Phillip Forrest SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 16. 2000 Project No.: 0791-2208 SAMPLE DATE: February 8, 2000 CONTRACTOR: TICKET NO.: 3098916 AMBIENT TEMP. (°F): 68.9 CONCRETE TEMP. (°F) (ASTM C.1064): 60.5 TIME BATCHED: 2:59 pm TIME SAMPLED: 3:50 pm WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Piers: Dal Mac / Cortez Group CONCRETE SUPPLIER: baltimore PLANT/TRUCK: 3/734 MIX ID NUMBER: · 16 AIR (%) (Aswa c-23t): 2.50 WATER ADDED (gal): 0 SLUMP (in.) (ASwa C-~43): 7 114 D/23, C/22 bottom 1/2 D/18 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRES8IVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (1~i) CHC 572 7 02/15/00 86000 3040 3000/28 days CHC 573 28 03/07/00 CHC 574 28 03/07/00 CHC 575 Hold Fracture mode is' (A) unless olhmwtse holed Specifications: Making, ASTM C-31 Testing ASTM C-143, Typesof ~] ~, ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 16, 2000 Project No.: 0791-2208 SAMPLE DATE: February 8, 2000 CONTRACTOR: TICKET NO.: 3098864 AMBIENT TEMP. (°F): 49.8 CONCRETE TEMP. (°F) (ASTM C-t064): 54.7 TIME BATCHED: 8:03 am TIME SAMPLED: 8:40 am WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Pier: Dal Mac / Cortez Group CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/964 MIX ID NUMBER: 16 AIR (%) {ASTM C-231): 3.0 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 6 B/24.5, Q.5/8, B/24.1, B24.4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRES~'~VE CYLINDER AGE DATE LOAD STRENGTH STREHGTH NUMBER (days) TESTED (pounds) (psi) (!~i) CHC 568 7 02/15/00 103000 3640 3000/28 da}/s CHC 569 28 03~07/00 CHC 570 28 03107/00 CHC 571 Hold Fracture mode is (A) unless otherwise holed Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~] [~ [~] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMHIrm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Witliford FUGRO SOUTH, INC. 2880 v;i-vo lane; D~.'.~, Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: PROJECT: DRILLING CONTRACTOR: Location: Drilled Piers Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 16, 2000 Coppell High School, Stadium Expansion, Coppell, Texas Proje~"t No.: 0791-2208 Street Foundation Page 1 DATE PERFORMED: February 1~2000 ~ii:~ ~: = 0.4lB. 1 18 14.4 152 0.5/B.4 18 13.5 4.0 7.0 20.5 Yes Yes Yes 153 C/1 36 11.0 5.0 5.0 16.0 Yes No No 73 36 9.0 4.0 6.5 15.5 Yes No No 100 D/2 36 11.5 5.0 5.5 17.0 Yes No No 99 D/24 36 12.5 4.0 4.3 16.8 Yes No No 87 Reinforcing steel checked in all piers and found to be in accordance with project require~. ~ents, unless otherwise noted. Bearing Material: Gray Shale m During drilling operations; however, piers were dry prior to placement of concrete. Phillip L. Forrest Fugro Technician FUGRO SOUTH INC. Reviewed By: ~"~-- '~.-~'"-'"--. SMH/bg Distribution: Dal-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford