Loading...
SC-Coppell HS-LR000215FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 15, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 15, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac - Cortez Group 7083176 65.3 62.7 1:46 pm 2:55 pm Pier: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/959 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): ' 3 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4 CI17, bottom 114 - B/5.5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.2/' square inchee TOTAL COMPRESSIVE SPECIFIED COMPRES~JVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (p~l) CHC 560 7 02114/00 105000 3710 3000/28 da}is CHC 561 28 03106/00 CHC 562 28 03106/00 CHC 563 Hold Fracture mode is (A) ta-~ olll~-vV~ ~ Specifications: Making & ASTM C-31 Testing ASTM C'143. Typesof ~ [~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D ,,, REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; E, iG~, Texas 75229 Ph (972) 484.8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppeli lSD, c,/o Dal - Mac Construction Co. PROJECT: Coppell High School, Stadium Expansion, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: February 15, 2000 Project No.: 0791-2208 Page I DATE PERFORMED: FebruaW 11, 2000 Location: Drilled Piers ~24.9 18 11.0 5.0 5.0 16.0 Yes No No 157 AD/I.6 24 14.8 4.0 4.2 19.0 ~ Yes No No 1~ F.5/25.4 18 10.5 6.0 6.5 17.0 Yes No No 160 F.3/24.9 18' 10,7 6.0 6.1 16.8 Yes NO ..... No 159 AD/I.1 24 14.4 4.0 4.2 18.6 Y~ No No 145 ~25.3 18 9.1. 6.0 6.4 15.5 'Yes No No 161 AD/0.4 24 14.4 4.0 4.1 18.5 Yes No . ~ No 1 ~ D.9/25 18 10.4 6.0 6.5 16.9 Yes No No 162 D/24 18 13.0 6.0 6.2 19.2 Yes No No 130 F/24 18 12.2 6.0 6.1 18.3 Yes No No 129 AC/0.2 24 13.5 4.0 4.4 17.9 Yes No No 148 AD/0.2 24 13.5 4.0 4.1 17.6 Yes No No 147 C.8/23.5 18 15.0 4.0 4.1 19.1 Yes No No 131 FJ22.6 18 14.1 6.0 6.4 20.5 Yes No No 128 F/22.4 18 14.5 6.0 6.2 20.7 Yes No No 127 AB/0.4 24 13.5 4.0 4.0 17.5 Yes NO No -. ]49. 0.4/0.5 ..24 12.9 .4.0 4.2 17.1 .Yes -No " No ...... ]~0. ' 0.4/A 18 .12.9 4.0 4.3 ~7.2 Yes~ No No 151 F/21.3 18 14.0 6.0 6.8 20.8 Yes NO No 126 F/21.1 18 13.8 6.0 6.1 19.9 Yes No No 125 Fl20.0 18 14.9 6.0 6.9 21.8 Yes No No 124 FUGRO SOUTH, INC. 2880 Vlrgo Lane; ~U~, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 15, 2000 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 2 DATE PERFORMED: Februa,ry !.1' 2000, 0.4lB. 1 0.2/B.4 F/19 G.5/17.9 G.5/16.1 B.5/1.5 B.8/1.6 18 18 18 18 18 18 18 14.4 12.8 14.8 14.0 14.0 14.9 13.8 4.0 6.0 4.0 4.2 6.1 4.2 5.4 4.0 4.0 4.1 4.0 4.2 17.0 20.9 18.2 19.4 19.0 18.0 * Yes * 152 No No No No No No No No Yes Yes Yes Yes Yes No NO . ~ No Yes Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale During drilling operations; however, piers were dry prior to placement of concrete. * Pier not completed, encountered water and will require casing to completed. 154 123 121 120 155 156 Phillip L. Forrest Fugro Technician FUGRO SOUTH INC. Reviewed By: -'i'p. SMH/bg Distribution: DaI-Mac Construction - Damon~Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 15, 2000 Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 7, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac - Cortez Group 3098805 CONCRETE SUPPLIER: Lattimore 60.5 PLANT/TRUCK: 3/1049 63.08 MIX ID NUMBER: 16 3:27 pm AIR (%) (ASTM C-23t): 3 4:32 pm WATER ADDED (gal): 5 Clear SLUMP (in.) (ASTM C-t43): 3 3/4 Pier 0.5/5.5 middle 2/3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIPic~ COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 564 7 02/14/00 118000 4170 3000/28 days CHC 565 28 03/06/00 crc 566 28 03/06/00 - CHC 567 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C'143' Types°f ~ [~] [~] E] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppetl lSD, c/o Dal - Mac Construction Co. Coppeil High School, Stadium Expansion Coppell, Texas Report Date: February 15, 2000 Project No.: 0791-2208 SAMPLE DATE: February 7, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-¶064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac - Cortez Group 7083162 CONCRETE SUPPLIER: Lattimore 56.8 PLANT/TRUCK: 7~956 59.4 MIX ID NUMBER: 16 11:26 am AIR (%) (ASTM C-231): 3 1/4 12:05 pm WATER ADDED (gal): 0 Cloudy SLUMP (in.) (ASWa C.143): 8 1/4 Top 2/3 of pier C/19.5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12', 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 556 7 02/14/00 56000 1980 .. 3000/28 days CHC 557 28 03/06/00 ..~ CHC 558 28 03/06/00 CHC 559 Hold Fracture mode is (A) unleas othen~se noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ [-'] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Stadium Expansion Coppell, Texas Report Date: February 15, 2000 Project No,: 0791-2208 SAMPLE DATE: February 7, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-'1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac - Cortez Group 3098746 CONCRETE SUPPLIER: Lattimore 57.2 PLANT/TRUCK: 3/820 55.2 MIX ID NUMBER: 16 9:08 am AIR (%) (ASTM C-231): 3 1/4 9:50 am WATER ADDED (gal): 0 Partly cloudy SLUMP (in.) (ASTM C.143): 7.50 Pier C/2 - bottom 2/3 of C/3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 552 7 02/14/00 98000 3470 3000~28 days CHC 553 28 03106/00 .~, CHC 554 28 03/06/00 CHC 555 Hold Fracture mode is (A) unless othe.,'wise noted Speciflcalions: Making & ASTM C-31 Testing ASTM C-143, Typ. of ~ FT'I F'~ n Cudng: Methods: ASTM C-39 Fracture: AV~I I/XI [/] I lB C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: '~'-~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford