Loading...
SC-Coppell HS-LR000214FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Tex~_~ 7-~ Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 14, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 4, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 48.4 CONCRETE TEMP. (°F) (ASTM C-1064): 54.7 TIME BATCHED: 9:20 am TIME SAMPLED: 10:10 am WEATHER CONDITION: LOCATION OF PLACEMENT: Piers: Dal Mac I Cortez Group CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/958 MIX ID NUMBER: 16 AIR (%) (ASTM C-231): 3.0 WATER ADDED (gal): 0 SLUMP (in.) (As'rM C-t43): 5 AC/249, D/2, bottom % D/3 CONCRETE CYLINDER COMPRESSIVE S1RENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH N I~ .~'-_ ~'- E R (days) TESTED (pounds) (psi) (psi) CHC 548 7 02/11/99 100000 3540 3000/28 days CHC 549 28 03/03/00 CHC 550 28 03/03/00 CHC 551 Hold Fracture mode is (A) unless otherwise Speciflca,ons: Making & ASTM C-31 T--ting ASTM C'143, Type$°f ~ [~ ~ r'] cudng: Me~hods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. Reviewed By: ~ ~' -- SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Coppeil lSD, c/o Dal - Mac Construction Co. REPORT DATE: February 14, 2000 Coppell High School, Stadium Expansion, Coppell, Texas PROJECT NO: 0791-2208 DA-rE PERFORMED: February 11, 2000 "1 Density Test Method: Number 1 ASTM 0-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Description Maximum Dry Density (pcf) Red silty sand with some dark gray clay 119.4 TEST RESULTS 111 112 113 114 115 116 Remarks: Method of Compaction: ASTM D-698 Proctor Results Optimum Moisture (%) 12.2 TEST PROCTOR LOCATION UNIT DRY MOISTURE NO. NO. WEIGHT CONTENT PERCENT 110 1 15 inch storm drain, Line A-2, station 110.8 12.1 3+45, 5 feet below grade 1 15 inch storm drain, Line A-2, station 119.0 3+45, 3 feet below grade 1 15 inch storm drain, Line A-2, station 115.2 3+45, I foot below grade 1 15 inch storm drain, Line A-2, station 116.1 1 +00, 3 feet below grade 1 15 inch storm drain, Line A-2, station 120.7 1+00, 1 foot below grade 1 8 inch water, Line "A", station 13+00, 2 117.4 feet below grade 1 8 inch water, Line "A", station 17+00, 2 118.5 feet below grade All densities meet project specifications unless otherwise noted. PERCENT OF MAXIMUM DENSITY 101.3 11.1 99.7 13.1 96.5 10.9 97.3 11.3 '" 101.1 12.1 98.4 12.6 99.6 Mike Flute Fugro South Technician SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis ~ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH INC. Reviewed By:_ FUGRO SOUTH, INC. 2880 virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dui - Mac Construction Co. PROJECT: Coppell High School, Stadium Expansion, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: February 14, 2000 Project No.: 0791-2208 Page 1 DATE PERFORMED: February 10, 2000 Location: Drilled Piers ActUaI i!Eene~a" Penetra~ pier Number Mate'~i~l ~?~i~: , tio~ ft; AIi~ ~ ~ ,~ ~,~ ~ ~,~!i~ ~i;,~'d~ ~ !iil i[~ai~ks AB/4.9 18 20.6 4.0 4.3 24.9 Yes No No 67 AB/4.2 18 20.5 4.0 4.1 24.6 Yes No No 68 0.5/6.5 18 20.0 6.0 6.1 26.1 Yes No No 19 AB/9.2 18 21.0 4.0 4.2 25.2 Yes N° NO 66 O.5/19.5 60 19.5 4.0 4.2 23.7 Yes No No 43 A/19.5 60 18.6 4.0 4.0 22.6 Yes No ...., No 44 A.3/6.5 18 19.5 7.0 7.1 26.6 Yes No No 18 A.3/7.8 18 19.0 7.0 7.3 26.3 Yes No No 35 0.5/2 36 18.5 4.0 4.0 22.5 Yes No No 10 B/6.5 18 19.7 7.0 7.3 27.0 Yes No No 17 A/2 36 18.0 4.0 4.1 22.1 Yes No No 11 AB/10.1 18 21.5 4.0 4.1 25.6 Yes No No 65. B/2 36 16.6 10.0 10.0 26.6 Yes No No 4 0.5/3 36 !9,~5 4.0 4.1 23.6 Yes No No 9 A/3 36 18.0 4.0 4.3 22'3 Yes ...... No No 12 A.4/17.3 18 20.1 7.0 7.2 27.3 Yes No No 32 B/3 36 19.2 10.0 10.1 29.3 Yes No No 5 0.5/4 36 19.5 8.0 8.0 27.5 Yes No No 13 FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. PROJECT: Coppell High School, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: February 14, 2000 Project No.: 0791-2208 Page 2 DATE PERFORMED: Location: Drilled Piers ::Number Ma~i!~ D/2.1 24 16.4 6.0 6.4 22.8 Yes No No 101 A/4 36 19.6 7.0 7.8 27.4 Yes No No 14 B/4 36 19.0 10.0 10.3 29.3 Yes No No 15 D/22.6 24 19.0 4.0 4.0 23.0 Yes No No 104 C/27.5 18 19.0 6.0 6.2 25.2 Yes No No 105 H/25.2 18 12.2 5.0 5.4 17.6 Yes No -. ~ No 158 F/14 24 16.5 4.0 4.2 20.7 Yes No No 111 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Matedah Gray Shale Phillip L. Forrest Fugro Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Damon~Norman City of Coppell - Larry Davis / Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: