Loading...
SC-Coppell HS-LR000209FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: February 9, 2000 PROJECT: Coppell High School, Stadium Expansion Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: February 1, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.t0S4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 7O82899 62 75 9:51 10:40 CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/752 MIX ID NUMBER: 16 AIR (%) (ASTM C-23t): WATER ADDED (gal): 0 Overcast SLUMP (in.) (ASTM C-143): Stadium, straight shaft foundation piers sampled at pier B-21 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x '12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 516 7 02/08/00 86000 3040 3000/28 days CHC 517 28 02/29/00 CHC 518 28 02/29/00 CHC 519 Hold Fracture mode is (A) unless otherwise r,o~e~ Specifications: Making & ASTM C-31 Testing ASTM 0'143' Typesof ~] ~[~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. Reviewed By: ~. SMH/rm Distribution: DaI-Mac Construction - Damon.,~Nerman City of Coppell - Larry Davis ~- Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620.7328 DRILLED PIER OBSERVATION REPORT CLIENT: PROJECT: DRILLING CONTRACTOR: Coppell lSD, cio Dal - Mac Construction Co. Coppell High School, Stadium Expansion, Coppell, Texas Street Foundation Report Date: February 9, 2000 Project No.: 0791-2208 Page 1 Location: Drilled Piers DATE PERFORMED: February 7, 2000 Pier ~enet~ '?'~:: ?~ ~ ~ :::Number 'i ~P: ~ ~'~: ~"'~ C/2 36 16.4 8.0 8.2 24.6 Yes No No D/19.5 60 lg.g 4.0 4.1 24.0 Yes No No C/3 36 18.8 8.0 8.2 27.0 Yes No No O/19.5 60 20.0 4.0 4.0 240 Yes No No 0/4 36 lg.6 8.0 8.4 28.0 Yes No No B/lg.5 60 20.0 4.0 4.5 24.5 Yes No No C/8 36 21.6 8.0 8.7 30.3 Yes No No D/5.5 60 19.7 4.0 4.0 23.7 Yes No No C/11 36 20.3 6.0 6.3 26.6 Yes No No C/5.5 60 20.0 4.0 4.6 24.6 Yes No No C/14 36 19.4 6.0 6.6 26.0 Yes No No B/5.5 60 18.5 4.0 4.1 22.6 Yes No No O/17 36 19.3 8.0 8.9 28.2 Yes No No D.5/5.5 60 20.0 4.0 4.8 24.8 Yes No No C/21 36 19.7 8.0 8.4 28.1 Yes No No FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dat- Mac Construction Co. PROJECT: Coppell High School, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: February 9, 2000 Project No.: 0791-2208 Page 2 DATE PERFORMED:. . . February 7,.. 2000 .. : Location: Drilled Piers ::Numbe~: "':~:"~:~ ~:: '~:' ~: :, ti~h ff.::!!::i::~i~ ~ ~ !g~ ,~i ~ma~ A5.5 60 18.4 4.0 4.9 23.3 Yes No No B/17 36 20.4 10.0 10.0 30,4 Yes No No B/14 36 20.0 10.0 10.5 30.5 Yes No No C/23 36 16.4 6.0 6.3 22.7 Yes No No B/11 36 20.0 10.0 10.0 30.3 Yes No No B/8 36 20.0 10.0 11.0 31.0 Yes No No Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale Phillip Forrest Fugro Technician SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis ~ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH INC. Reviewed By: ~'~- FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT Coppell lSD, c/o Dal - Mac Construction Co. CLIENT: PROJECT: Coppell High School, Stadium Expansion, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: February 9, 2000 Project No.: 0791-2208 Page 1 ~L~res~Bc~ B/24.5 18 11.1 4.0 4.0 15.1 Yes No No 0.5/8 36 20.0 4.0 4.6 24.6 Yes No No ~8 36 20.0 4.0 4.8 24.8 Yes No No B24.1 18 12.1 4.0- 4.3 '16.~ Yes No- No O.5/11 36 19.9 4.0 4.1 24.0 Yes -No No B24.4 18 18.3 4.0 4.0 22.3 Yes Yes Yes ~11 36 19.5 4.0 4.5 24.0 Yes No No 05/14 36 20.0 4.0 4.8 24.8 Yes No No N14 36 19.5 4.0 4.5 24.0 Yes No No B.3/23.5 18 16.7 4.0 4.3 21.0 Yes No No Q5/17 36 19.8 4.0 4.4 24.2 Yes No No AB/20.9 18 19.1 4.0 4.5 23.6 Yes Yes Yes N17 36 19.8 4.0 4.0 23.8 Yes No No D/23 36 17.0 4.0 4.2 19.2 Yes No No C/22 36 18.8 8.0 8.1 26.9 Yes No No D~4 36 12.0 4.0 4.4 16.4 Yes- No AB/20.1 18 19.0 4..0 ~ 4,0 23.0 Yes - '~ No .... 0.5/18.4 18 .19:3 6.0 6j2 ; 25;5 .... Yes ..... No No. F/18 36 15.0 4.0 4.1 19.1 Yes No No F/16 36 15.5 6.0 6.1 21.6 Yes No No G/16 36 16.6 6.0 6.4 23.0 Yes No No DATE PERFORMED: February 8, 2000 Location: Drilled Piers FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT Coppeil lSD, c/o Dal- Mac Construction Co. Coppell High School, Coppell, Texas Street Foundation DATE PERFORMED: CLIENT: PROJECT: DRILLING CONTRACTOR: Location: Drilled Piers Report Date: February 9, 2000 Project No.: 0791-2208 Page 2 February 8, 2000 :: : ~ ~:Sh~~ ~;~ia~ Actual ~~T~ ; Pier Dl~et~r ~ ~:~e~e~~ ~ .~ F/15 36 15.6 6.0 6.2 21.8 Yes No No A.4/18.6 18 19.8 7.0 7.2 28.8 Yes No No G/15 36 15.0 6.0 6.0 21.0 Yes No No F/13 36 15.5 6.0 6.2 21.7 Yes No No B/18.8 18 20.0 7.0 7.4 27.4 Yes No No G/13 36 15.7 4.0 4.1 19.8 Yes No No Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale (4) During drilling operations; however, piers were dry prior to placement of concrete. Phillip Forrest Fugro Technician FUGRO SOUTH INC. Reviewed By: *~, SMH/bg Distribution: DaI-Mac Construction - Damon..j~orman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford