SC-Coppell HS-LR000204FUGRO SOUTH, INC.
CLIENT:
PROJECT:
288O VIrgo Lane;
Ph (972) 484-8301;
GENERAL REPORT
Dallas, Texas 75229
Fax (972) 620-7328
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Stadium Expansion
Coppell, Texas
Report Date: February 4, 2000
Project No,: 0791-2208
DAILY ACTIVITY REPORT: February 2, 2000
Services Performed:
Weather Conditions:
Contractors on Site:
Visual Inspection
Clear
DaI-Mac
Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project
to perform the following tests and observations as requested:
· Arrived at the above said project to perform a visual observation and inpsection of drilled pier and record
data.
Bob Shea
Fugro South Technician
SMH/bg
Distribution:
DaI-Mac Construction - Damon ..Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
David A. Belcher, P.E.
Sr. Project Manager
FUGRO SOUTH, INC.
2880 Vlrgo Lane; Dallu, Tex~ ?5229
PI~ (972) 484-8301; F~x (972) ~0.732~
DRILLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co.
PROJECT: Coppell High School, Stadium Expansion, Coppell, Texas
DRILLING CONTRACTOR: Street Foundation
Report Date: February 4, 2000
Project No.: 0791-2208
Page 1
Location: Drilled Piem
~ep~: ~ ~
No I No 52
O.~24 36 18.0 4.0 4.30 22:30 Yes 'NoI NO 51
B/24 36 16.7 9.0 9.0 2'5.70 Yes NoIi No 50
O.~23 36 17.7 4.0' 4.1 21.86 Yes No~ I No 53
~23 36 17.2 4'0 4.1 21.3 Yes NoI,i No 55
B/23 36 14.3 10.0 12.4 26.7 Yes No I No 49
I
O.~21.5 18 16.4 6.0 6.1 22.5 Yes No I No 45
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Beadng Material: Gray Shale
Bob Shea/Phillip Forrest
Fugro Technician
FUGRO SOUTH INC.
Reviewed By: ~_ .-'~-~_.~--...----,
SMH/bg
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Vlrgo Lane: Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) ~0-7328
DRILLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co.
PROJECT: Coppell High School, Stadium Expansion, Coppell, Texas
DRILLING CONTRACTOR: Street Foundation
Report Date: February 4, 2000
Project No.: 0791-2208
Page 1
I, ,, , , , DATE PERFORMED: February 3, 2000 , I
Location: Drilled Piem
:~Plan Actual : :TO~i?~ ~ ,
A3/21.5 18 17.0 7.0 7.3 24.3 Yes No No 46
B/21.5 18 19.5 7.0 7.3 26.8 Yes No No 47
AB/~. 1 18 18.3 4.0 4.0 22.3 Yes No No 60
AD/23.5 24 12.2 4.0 4.0 16.2 Yes No No 143
0.5/24.5 24 12.1 4.0 4.1 16.2 Yes No No 137
AD/23.9 24 12.1 4.0 4.4 16.5 Yes No No 142
AD/24.3 24 12.1 4.0 4.4 16.5 Yes No No 141
AD/24.9 24 12.0 4.0 4.6 16.6 Yes No No 140
AB/24.5 24 11.9 4.0 4.4 16.3 Yes No No 138
A.5-24.5 18 11.7 6.0 6.4 18.1 Yes No No 136
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Gray Shale
Phiilip Forrest
Fugro Technician
SMH/bg
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH INC.
Reviewed By:. '~ -~-'~'~"~