Loading...
SC-Coppell MSW-CS010917September 17, 2001 Robert Howman Glenn Engineering, Inc. FIL 100 Decker Ct, Suite 250 Irving, TX 75062-2206 RE: CoppeH Middle School West Renovation Coppell 1SD Service Center Construction Plan Approval Dear Robert: The City of Coppell has reviewed the revised plans for the referenced addition. These plans meet our current minimum standards. All contractors and subcontractors must have a copy of the plans approved by the City of Coppell onsite. Inspection fees must be paid prior to release of this project for construction. The City assesses a 2% inspection fee for all private construction onsite outside the building's footprint. This would include dirt work, erosion control, paving, storm drain, water lines, sewer lines, storm sewer pipes, etc. that are private. For all public installations, the City of Coppell charges a 4% fee. Please provide a copy of the contract for verification of calculations. If you have any questions, please contact me at (972) 304-3686. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering & Public Works ::)§5 PARKWAY 'tt P O BOX 478 lit COPPELL TX 75Ol9 dr TEL 97222:/46222 0022222222 dr FAX 972/304 3673