Loading...
SC-Coppell MSW-CS010905 Gle~ Engineering Co~. j De ke :SO Z ~: CMSW Semite Center Fee Assessment Le~er ~ Enclo~d is a copy of the Ci~ of Coppell Development Fee Assessment robie, ~ong ~ a copy of ~e Development Fee calculations for ~e referenced development. Ple~e note that ~pact Fees ~e not ~sessed against the CISD. Ple~e provide a copy of ~e Engineer's estimate or coneact to o~ office so ~e 2% & 4% const~ction inspection fee c~ ~ verified. ~e addition~ fees for water ~d sewer raps, water mete~, ~d utili~ inspection fees need to be p~d at ~e Public Wor~ Se~ice Center, 732 Deforest. Meters ~11 be ordered when these fees ~e paid. Approp~ate payment of ~e required fees will help ins~e a success~l begi~ing of ~s project. We look fo~d to working ~ you on ~s project. If you have ~y questions, ple~e contact me. Sincerely, ~i~Engineer cc: Je~ifer ~s~ong, Fin~ce Director ~onda Bm~e~, Engineering Secret~ Gle~ Hollowell, Assismt Director of Public Wor~ Greg Jones, Chief Building Offici~ G~ Sims, Director of Leis~e Se~ices 255 PARKWAY' '1' P O BOX 478 "k COPPELI. TX 75019 'ti' TEt. 972/462 0022 ~ F'AX 972/304 3673 DEVELOPMENT FEE TABL Project: CMSW Service Center Date: 9/5/2001 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $250.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,085.70 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,725.49 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permi0 Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (l 00% due prior to Acceptance of Project il Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $4,316.19 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: CMSW Service Center DATE: 9/5/2001 Water Impact Fee: Domestic Meter(s): I - 3 inch = 16 ESU's Irrigation Meter(s): 3 - 2 inch = 24 ESU's 0 = 0 ESU's Fireline Meter(s): 1 - 8 inch = 2.5 ESU's Total #: 0 ESU's @ $450.00 ea. $0.00 (100% due prior to Council approval of the final plat) (no impact fees assessed per ordinance) Water Tap Inspection Fee: Total #: 5 Connections @ $50.00 ea. $250.00 (Single family due pdor to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $1,085.70 $1,085.70 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 3 Irrigation Meter(s) @ $189.37 $568.11 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 1 Fireline Meter(s) ~ $2,157.38 $2,157.38 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. $120.00 (100% due pdor to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 ~ $450.00 ea. $0.00 (no impact fees assessed per ordinance) Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots (~ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHE,-T * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot $0.00 0 Multi-family ~} $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for pdvate improvements) (4% of development cost required for public improvements) P~e2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: CMSW Service Center DATE: 9/$/2001 ROADWAY IMPACT FEE: Service Area * 10 Category ** Institutional Land Use ** Institutional Others Not Specified Building Area (sO 46,334 Development Units ** 46.33 Vehicle Miles per Development Unit ** 0.56 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $7,784.11 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) Impact Fees not assessed against the CISD