SC-Coppell MSW-CS010905 (2) September 5, 2001
Robert Howman
Glenn Engineering Corp.
100 Decker Court Suite 250
Irving, Tx 75062
RE: CMSW 2001 Additions/Renovations
Fee Assessment Letter
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development. Please note
that Impact Fees are not assessed against the CISD.
Please provide a copy of the Engineer's estimate or contract to our office so the 2% &
4% construction inspection fee can be verified.
The additional fees for water and sewer taps, water meters, and utility inspection fees
need to be paid at the Public Works Service Center, 732 Deforest. Meters will be ordered
when these fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this
project. We look forward to working with you on this project. If you have any questions,
please contact me.
Sincerely,
'City Engineer
cc: Jennifer Armstrong, Finance Director
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
255 PARKWAY 'Jtr P O 19OX 478 1Ir COPPELL TX 75019 ~' TE:L 972/4.62 0022 ~' FAX 972/304. 3673
DEVELOPMENT FEE TABLE
Project: Coppell Middle School West 2001 Addition/Renovation
Date: 9/5/2001
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $378.74
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project I[
Construction Inspection Fee Information not Available
II
TOTAL $538.74
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
DEVELOPMENT FEE WORKSHEEr
PROJECT: Coppell Middle School West 2001 Addition/Renovation
DATE: 9/5/2001
Water Impact Fee:
Domestic Meter(s): 0 -- 0 ESU's
Irrigation Meter(s): 2 - 2 inch = 16 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 0 ESU's @ $450.00 ea. $0.00
(100% due pdor to Council approval of the final plat)
(no impact fees acessed to CISD per Ordinance)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(Single family due pdor to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00 $0.00
(Single family due pdor to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s) @ $189.37 $378.74
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea. $0.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 0: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $450.00 ea. $0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
0 Single-family (~ $0.00 per lot $0.00
0 Multi-family @ $0.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $0.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted. $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2