Loading...
SC-Coppell MSW-LR001212FUGRO SOUTH, INC. --'I~'~'"- 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: December 12, 2000 PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0700-2227 DATE PERFORMED: December 8, 2000 General Contractor: Cortez Group Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Sidewalk following location: Time placement began: 1:50 Time placement ended: - Total cubic yards placed: 80 Slump range (inches): 5.5 to 6.0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore - Plant No. 7 Concrete temperature range (°F): 60°F Strength required (psi/days): 3000/28 Number of cylinders made: 4 Superplasticizer used: No Julio Perez Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMHtbg Distribution: K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 ) City of Coppell - Lee Stone City of Coppell - Larry Davis --~ Coppell lSD - Mickey Harper SHW Goup - Mike Elmore SHW Goup - Joe Craddock