OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: December 12, 2000
PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0700-2227
DATE PERFORMED: December 8, 2000
General Contractor: Cortez Group
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Sidewalk
following location:
Time placement began: 1:50
Time placement ended: -
Total cubic yards placed: 80
Slump range (inches): 5.5 to 6.0
Slump required (inches): 5.0
Concrete supplier and plant: Lattimore - Plant No. 7
Concrete temperature range (°F): 60°F
Strength required (psi/days): 3000/28
Number of cylinders made: 4
Superplasticizer used: No
Julio Perez
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By:
SMHtbg
Distribution: K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 )
City of Coppell - Lee Stone
City of Coppell - Larry Davis --~
Coppell lSD - Mickey Harper
SHW Goup - Mike Elmore
SHW Goup - Joe Craddock