Services Performed: Visual Inspection
Weather Conditions: Fair & Cool
Contractors on Site: K.A. Sparks
Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project
to perform the following tests and observations as requested:
Monitored pier drilling and cast 4 cylinders on piers.
Also picked up 8 cylinders cast on 11-20-00.
Skip Martin
Fugro South Technician FUGRO SOUTH, INC.
David
Sr. Project Manager
SMH/nl
Distribution: K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 )
City of Coppell - Lee Stone
City of Coppell - Larry Davis~
Coppell lSD - Mickey Harper
SHW Goup - Mike Elmore
SHW Goup - Joe Craddock
FUGRO SOUTH, INC. '
2880 Virgo Lane; Dallas, Texas 75229
Ph (972)484-,.-3301; Fax (972) 8?_0-7328
DRILLED BELLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: November 30, 2000
PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0700-2227
DRILLING CONTRACTOR: North Texas Drilling Page 1
I DATE PERFORMED: November 21, 2000 I
LOCATION: Competition Softball Field Dugouts
Pier Required Required Total Depth, Proper Water Remarks
Number Shaft Bell ft. Alignment Present
Diameter, in. Diameter, in.
1 -NW 18" 36" 10.2' Yes No North Side
Dugout
2-SW 18" 36" 10.3' Yes No North Side
Dugout
3-N CTR. 18" 42" 10.0' Yes No North Side
Dugout
4-S CTR. 18" 36" 10.4' Yes No North Side
Dugout
5-NE 18" 36" 10.5 Yes No North Side
Dugout
6-SE 18" 36" 10.2 Yes No North Side
Dugout
7-NE 18" 36" 11.0 Yes No North Side
Dugout
8-NW 18" 36" 11.2' Yes No North Side
Dugout
9-E CTR. 18" 36" 11.3' Yes No North Side
Dugout
10-W CTR. 18" 42" 11.0' Yes No North Side
Dugout
11 -SE 18" 36" 11.4' Yes No North Side
Dugout
FUGRO SOUTH, INC. '
2080 Virgo Lane: Dallas, Texas 75229
Ph (972) 484-8301: Fax (972) 620-7328
DRILLED BELLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: November 30, 2000
PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0700-2227
DRILLING CONTRACTOR: North Texas Drilling Page 2
DATE PERFORMED: November 21, 2000
LOCATION: Competition Softball Fields Dugouts
Pier Required Required Total Depth, Proper Water Remarks
Number Shaft Bell ft. Alignment Present
Diameter, in. Diameter, in.
12-SW 18" 36" 11.2 Yes No North Side
Dugout
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Tan gray shaley clay
Skip Martin
Fugro Technician FUGRO SOUTH INC.
Reviewed By:
SMH/nl
Distribution: K A Sparks Contractors Inc. - Jim Schooler
K ^ Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511)
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Goup - Mike Elmore
SHW Goup - Joe Craddock
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED BELLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: November 30, 2000
PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0700-2227
DRILLING CONTRACTOR: North Texas Drilling Page 1
DATE PERFORMED: November 21, 2000
LOCATION: Batting Storage Building at Softball Practice Field
Pier Required Required Total Depth, Proper Water Remarks
Number Shaft Bell ft. Alignment Present
Diameter, in. Diameter, in.
1 -NW 18" 36" 10.3' Yes No
2-SW 18" 36" 10.2' Yes No
3-NE 18" 36" 10.5' Yes No
4-SE 18" 36" 10.1' Yes No
BATTING STORAGE BUILDING AT EXISTING BASEBALL FIELD
1-NW 18" 36" 10.0' Yes No i
2-SW 18" 36" 10.4' Yes No
3-NW 18" 36" 10.6' Yes No
4-SE 18" 36" 10.1' Yes No
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Tan gray shaley clay
Skip Martin
Fugro Technician FUGRO SOUTH INC.
Reviewed By: '~. ~-M~...~....._...._.
SMH/nl
Distribution: K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 )
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Goup - Mike Elmore
SHW Goup - Joe Craddock
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-6301; Fax (972) 620-7328
DRILLED BELLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: November 30, 2000
PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0700-2227
DRILLING CONTRACTOR: North Texas Drilling Page 1
DATE PERFORMED: November 21, 2000
LOCATION: Competition Baseball Field Dugouts
Pier Required Required Total Depth, Proper Water Remarks
Number Shaft Bell ft. Alignment Present
Diameter, in. Diameter, in.
1-SW 18" 36" 10.2' Yes No South Side
Dugout
2-NW 18" 36" 10.4' Yes No South Side
Dugout
3-S. CTR 18" 42 10.0' Yes No South Side
Dugout
4-N. CTR 18" 36" 10.1' Yes No South Side
Dugout
5-NE 18" 36" 10.5' Yes No South Side
Dugout
6-SE 18" 36" 10.3' Yes No South Side
Dugout
7-SW 18" 36" 10.2' Yes No South Side
Dugout
8-SE 18" 36" 10.2' Yes No South Side
Dugout
9-W. CTR 18" 42" 10.5' Yes No South Side
Dugout
10-E. CTR 18" 36" 10.1' Yes No South Side
Dugout
FUGRO SOUTH, INC. '
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED BELLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o K A Sparks REPORT DATE: November 30, 2000
PROJECT: Coppell Middle School West, Coppell. Texas PROJECT NO: 0700-2227
DRILLING CONTRACTOR: North Texas Drilling Page 2
I DATE PERFORMED: November 21, 2000 I
LOCATION: Competition Baseball Field Dugouts
Pier Required Required Total Depth, Proper Water Remarks
Number Shaft Bell ft. Alignment Present
Diameter, in. Diameter, in.
I
11 -N.E 18" 36" 10.4' i Yes No South Side
Dugout
12-NW 18" 36" 10.3' Yes No South Side
Dugout
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Tan gray shaley clay
Skip Martin
Fugro Technician FUGRO SOUTH INC,
Reviewed By: '-~'"'~-'"'"'~.-,,-'.,.~,.~.----.-.-~
SMH/nl
Distribution: K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 )
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Goup - Mike Elmore
SHW Goup - Joe Craddock
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 464-8301' Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o K A Sparks Report Date: November 30, 2000
PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0700-2227
SAMPLE DATE: November 21, 2000
CONTRACTOR: The Cortez Group for K.A. Sparks
TICKET NO.: 7095336 CONCRETE SUPPLIER: LMC
AMBIENT TEMP. (°F): 55 PLANT/TRUCK: 7 / 958
CONCRETE TEMP. (°F) (ASTM C-1064).' 60 MIX ID NUMBER: 38
TIME BATCHED: 11:02 AIR (%) (ASTM C-231):
TIME SAMPLED: 11:49 WATER ADDED (gal):
WEATHER CONDITION: Fair/Cool SLUMP (in.) (ASTM C-143) .' 4.0
LOCATION OF PLACEMENT: Twelve belled piers for 2 competition baseball field dugouts
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CMW 141 7 11-28-00 88900 3140 3000/28 days
CMW 142 28 12-19-00
CMW 143 28 12-19-00
CMW 144 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typos°f [~ ~ B D
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Skip Martin
FUGRO SOUTH INC.
Reviewed By: ~ /
SMH/bg
Distribution: K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 )
City of Coppell - Lee Stone
City of Coppell - Larry Davis----"'
Coppell lSD - Mickey Harper
SHW Goup - Mike Elmore
SHW Goup - Joe Craddock
-'=I--
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o K A Sparks Report Date: November 30, 3000
PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0700-2227
SAMPLE DATE: November 20, 2000 I
CONTRACTOR: Cortez Group
TICKET NO.: 7095271 CONCRETE SUPPLIER: LMC
AMBIENT TEMP. (°F): 51 PLANT/TRUCK: 7/959
CONCRETE TEMP. (°F) (ASTM C-1064): 57 MIX ID NUMBER: 38
TIME BATCHED: 11:21 am AIR (%) (ASTM C-231):
TIME SAMPLED: 12:05 pm WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 4.50
LOCATION OF PLACEMENT: Slab for bleachers at south ball field, 5 feet south, 4 feet west of
northeast corner
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CMW 133 7 11/27/00 83800 2960 3000/28 days
CMW 134 28 12/18/00
CMW 135 28 12/18/00
CMW 136 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ [~
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Yancey Bivings
FUGRO SOUTH INC.
Reviewed By: ~ /
SMH/rm
Distribution: K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 )
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Goup - Mike Elmore
SHW Goup - Joe Craddock