Loading...
SC-Coppell MSW-LR001120FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o K A Sparks Report Date: November 20, 2000 PROJECT: Coppell Middle School West, Coppeil, Texas Project NO.: 0700-2227 SAMPLE DATE: November 13, 2000 I CONTRACTOR: Cortez Group TICKET NO.: 7095124 CONCRETE SUPPLIER: LMC AMBIENT TEMP. (°F): 61 PLANT/TRUCK: 7/938 CONCRETE TEMP. (°F) (AS?M C-1064): 76 MIX ID NUMBER: 38 TIME BATCHED: 1:20 pm AIR (%) (ASTM C-23t): TIME SAMPLED: 2:00 pm WATER ADDED (gal): 0 WEATHER CONDITION: Sunny & windy SLUMP (in.) (ASTM C-143): 5.50 LOCATION OF PLACEMENT: Slab on concession & restroom facility, sampled from east side of ticket area CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 129 7 11/20/00 84700 3000 3000/28 days CMW 130 28 12/11/00 CMW 131 28 12/11/00 CMW 132 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~ ~ E~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Jeff Jedlicka FUGRO SOUTH INC. Reviewed By: -~'/ SMH/rm Distribution: K A Sparks Contractors inc. - Jim Schooler K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 ) City of Coppell - Lee Stone City of Coppell - Larry Davisf Coppell lSD - Mickey Harper SHW Goup - Mike Elmore SHW Goup - Joe Craddock FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o K A Sparks Report Date: November 20, 2000 PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0700-2227 SAMPLE DATE: September 25, 2000 CONTRACTOR: K.A. Sparks TICKET NO.: 7093055 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 55 PLANT/TRUCK: 7/755 CONCRETE TEMP. (°F) (ASTM C-1064): 75 MIX ID NUMBER: 39 TIME BATCHED: 9:20 am AIR (%) (ASTM C-23t): 5.5 TIME SAMPLED: 10:30 am WATER ADDED (gal): 0 WEATHER CONDITION: Partly cloudy SLUMP (in.) (AS?M C.t43): 5 3/4 LOCATION OF PLACEMENT: Paving, for west parking lot area, sampled at 75 feet south, 20 feet east of northwest corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 17 7 10/02/00 68600 2430 3500/28 days CMW 18 28 10/23/00 90700 3210* CMW 19 28 10/23/00 92900 3290* CMW 20 56 11/20/00 103000 3640 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof 1~ [~ [~ Cudng: Methods: ^STM C-39 Fracture: A B C D REMARKS: *Does not meet required compressive strength at 28 days. Technician: Jose Rivera FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: K A Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 ) City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Goup - Mike Elmore SHW Goup - Joe Craddock FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-?328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o K A Sparks Report Date: November 20, 2000 PROJECT: Coppell Middle School West, Coppell. Texas Project No.: 0700-2227 I SAMPLE DATE: September 25, 2000 I CONTRACTOR: K. A Sparks TICKET NO.: 7093044 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 54 PLANT/TRUCK: 7/958 CONCRETE TEMP. (°F) (AS?M C.10S4): 72 MIX ID NUMBER: 39 TIME BATCHED: 8:21 am AIR (%) (ASTM C-231): 5.5 TIME SAMPLED: 9:15 am WATER ADDED (gal): 0 ~" WEATHER CONDITION: Partly cloudy SLUMP (in.) (ASTM C-143): 6 LOCATION OF PLACEMENT: Paving, for west parking lot area, sampled at 90 feet south, 15 feet west of northeast corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMW 13 7 10/02/00 69200 2450 3500/28 days CMW 14 28 10/23/00 89900 3180' CMW 15 28 10/23/00 91000 3220* CMW 16 56 11/20/00 101200 3590 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: *Does not meet required compressive strength at 28 days. Technician: Jose Rivera FUGRO SOUTH INC. Reviewed By' ,"- f SMH/rm Distribution: K ^ Sparks Contractors Inc. - Jim Schooler K A Sparks Contractors Inc. - Rick McKinney (Fax: 972-745-4511 ) City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Goup - Mike Elmore SHW Goup - Joe Craddock