SC-Coppell HS-CS 890515 THE CITY WITH A
BEAUTIFUL FUTURE
TO: J/%/~-- FROM: )~,/$$ i/~/L/~" DATE:
SUBJECT: ~~ ~~ ~~L ~ ~~o~
J';[ifvEAGUE NALL AND PERKINS, INC.
915 Florence Street/Fort Worth, Texas. 76102
817 336-5773
Hay 3, 1989 /
Mr. Russe!~'R. Doyle, P.E.
City Eng~eer
City o~ZCoppell
255 P~kway Blvd.
Co~l[tll, Texas 75019
Re: New Coppell High School
Plat Approval
MAY
SHWC. INC.
Arcltitects. £n[~.~,c?s. Pianner,~
DALLAS. "rExA?
Dear Mr. Doyle:
As requested by the City through the surveyor, Ayers & Associates, we are
submitting this letter to list those public utility items which have been
revised from the original plat and plan approval to this date.
To the best of our knowledge, the following items have been revised:
1. Add approximately 1000 LF 6" fire line to extend fire protection
to the west side of the stadium.
2. Adjust alignment of 60" storm drain north of the north property
line to avoid existing sanitary sewer manhole present in the
creek. The easement for the facility was revised accordingly.
3. Lower 10' x 8' box culvert from SCa. 7+70 to SCa. 15+20
accommodate developer to the east.
4. Delete box culvert headwall at the southeast corner of the site
and construct rock rip-rap transition in lieu of headwall for
ease of future southerly extension of the box culvert.
Item No. 1 was reviewed and approved by the City prior to construction.
Item Nos. 2 thru 4 were reviewed and approved by the City and coordinated
in the field with Steve Morton, Chief Development Inspector. To the best
of our knowledge, the above represents the revisions to the plans made
during construction and which were approved by City staff prior to
construction of said revisions. If you have any questions, please feel
free to call.
c:kfs
Gary Keep, SHWC, Inc.
TEAGUE NALL AND PERK~NS~I~C. ~' .... ~ ~'~
John H. Nail, Jr., P.E. <