Loading...
ST9602-CS000719 Coppell. Texas 75019 July 19, 2000 Jack Loggins Parsons Brinkerhoff CMAQ ~ro~ram Office ~?01 N. ~arke~ S~re¢~, Suite 4~0 Dallas, Texas ?5202 RE: Congestion Mitigation Air Quality Project gST 96-02 (CMAQ Project #10) Dear Mr. Loggins: This letter is written as a follow-up to our phone conversation of July 19, 2000 when we discussed several comments on the construction plans for CMAQ Project 10. In summary, we discussed: no lanes will be closed except between the hours of 9:00 a.m. and 4:00 p.m. and at any given time only one lane will be closed; the traffic light standards within the plans were not the City of Coppell standard traffic lights; due to the exorbitant cost of the retaining wall and because only six small trees are being saved by the wall, the City is requesting that the wall be deleted from the project and that the median area be reshaped and then hydro-mulched at the completion of the project; and our cost participation on this project. The City has previously provided monies to Dallas County for CMAQ Project 10. My records show that in July 1996, the City provided a check in the amount of $27,889.00 for CMAQ Project 10. That money was for the design of Belt Line @ MacArthur, Belt Line @ Wrangler, Bethel @ Denton Tap, and Moore @ Sandy Lake. Since that money was provided to Dallas County, Belt Line @ Wrangler and Moore @ Sandy Lake has been deleted from CMAQ Project 10. The City's cost for Belt Line @ Wrangler was $1,806.00 and for Moore @ Sandy Lake was $19,891.00. It's possible that some work was performed on those intersections, however, neither of the two referenced intersections were final designed. Therefore, there shou~d'be"'solTre 'mOney sdll aCaiiabie"~i'ith-Daiia~v County to help offset portions of the construction cost. Please investigate and provide to the City of Coppell an accounting of the credit we currently have with Dallas County to place toward the construction cost of CMAQ Project 10. Please let me know at your earliest convenience so I can start the process of appropriating any additional funds that may be needed for our cost participation. If you should have any questions, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works.